News and Updates
The Benefits of the First Milton Roy Authorized Service Centre in Africa

BOG RE Team at MR Authorized Service Centre

Bell Oil & Gas, the sole representative of Milton Roy (MR) in Nigeria for over a decade, is now the first MR Authorized Service Centre (ASC) in Africa. The service centre will provide in-country aftermarket support to clients across the oil and gas and general industries in Nigeria as well as technical support to the doorsteps of Milton Roy customers in Africa.

Milton Roy manufactures controlled-volume metering pumps that deliver unsurpassed reliability and accuracy in critical chemical dosing applications.

The ASC program seeks to wipe out fake MR spares and representatives.

BOG now has world-class and adequately trained field service engineers and product specialists with in-depth knowledge of Milton Roy (MR) products. The BOG MR team has the expertise to offer the right products that seamlessly align with customers’ processes at affordable prices without jeopardizing quality.

Built on a strong reputation of reliability, BOG combines vast industry experience, proven track record and a culture of excellent service delivery to carry out a comprehensive range of metering pumps and mixing technology services. n the oil & gas as well as general industries.

BOG has full authorization to perform repairs, maintenance and services on behalf of MR. This authorization also covers:

  • The installation start-up and commissioning: BOG’s team of MR service engineers will always be available at the service center to perform these functions. They will give recommendations and guidance on the best way to handle Milton Roy products.
  •  Health Check on site: Health checks that will be provided include but are not limited to inspection of chemical consumption, safeguard of rated flow and pressures, the monitoring level and condition of the oil, analysis of vibration on the motor etc.
  • Service and overhaul: BOG’s team of trained service engineers are available to repair and service any faulty Milton Roy equipment, ranging from basic pumps and mixers to the most complex systems.
  • Annual Maintenance Contract: The Annual Maintenance Contract assures year-round, first-rate care offer:
  1.        Extended Warranty Guarantees
  2.        Engineers who understand your equipment
  3.       Genuine Milton Roy spare parts
  4.       Availability of Upgrades and critical spares
  5.        Reduction in downtime
  •  Audit and Asset Mapping: This involves detailed mapping and recording of all on-site equipment which is recommended for long term and short- term operational spares.

Customers in the African oil & gas as well as general industries will now enjoy the benefits of:

  • Increased production
  • Improved equipment efficiency
  • A decrease in production downtime
  • A reduction of costs associated with equipment failure
  • Access to trained experts on Milton Roy products

All Updates


WHY YOU SHOULD CHOOSE HAIMO MULTIPHASE METER
Posted on Sunday, November 15, 2020


What You Need to Know About Goodwin Axial Isolation Valves
Posted on Sunday, November 8, 2020


BOG Holds Groundbreaking Ceremony for Multimillion Dollar Facility
Posted on Thursday, October 22, 2020


Changing the Narrative of Nigerian Businesses
Posted on


UF RACK Repair for Total E&P
Posted on


GRE Repair on ERHA FPSO
Posted on Monday, October 19, 2020


GRE Repair on USAN FPSO
Posted on


Filter Spools Fabrication for Total E&P
Posted on


8000 Hours Service of 4units of Ingersoll Rand Rs30i Compressors
Posted on Sunday, October 18, 2020


Commissioning of Sundyne Pump at NLNG
Posted on


The Secrets of Milton Roy’s Success in Africa
Posted on


NCDMB’s Executive Secretary Speech at BOG’s Groundbreaking Ceremony
Posted on


NNRA Inspection in BOG Port Harcourt
Posted on


OMB Cryogenic Valves
Posted on Sunday, September 27, 2020


NOV Spoolable Line Pipes
Posted on


6 Factors to Consider when Selecting your Metering/ Dosing pumps
Posted on Sunday, September 13, 2020


Benefits of Sundyne Marelli Pumps
Posted on Friday, August 21, 2020


Kayode Thomas’ Interview with BBC Africa
Posted on Friday, August 7, 2020


BOG Awards Construction Contract for Multimillion Dollar Pipe Threading and Valve Assembly Plants
Posted on Saturday, July 18, 2020


SON Issues IMS Certificate To BOG
Posted on


BOG-Expro Well Testing Campaign
Posted on


Technical Assistance Service
Posted on


Overhaul of Sundyne Pump at NLNG
Posted on


Focus on Sundyne
Posted on


The Benefits of the First Milton Roy Authorized Service Centre in Africa
Posted on


COVID-19 and The Workplace: Quality Health Safety and Environment (QHSE) Strategies at Bell Oil &Gas
Posted on


The Petroleum Industry Bill (PIB)
Posted on


CEO’s Message on Worker’s Day
Posted on Friday, May 1, 2020


FOCUS OF MILTON ROY
Posted on Saturday, April 11, 2020


Sundyne and BOG on Sales Visits
Posted on