News and Updates
Well Testing Campaign at Neconde’s Odidi Field

BOG continues to provide reliable Well Testing services to its numerous clients. This time, BOG mobilized a four-man team from our Well Testing Department and our Multi-Phase Flow Meter (MPFM) to the Neconde/Nigerian Petroleum Development Company (NPDC) Odidi Field to carry out Maximum Efficiency Rate (MER) tests on all flowing wells for product optimization. This is another Well Testing campaign BOG is undertaking for Neconde Energy Limited.

Well Testing simply means well data acquisition. Tests on oil and gas wells are performed at various stages of drilling, completion and production. The test objectives at each stage range from simple identification of produced fluids and determination of reservoir deliverability to the characterization of complex reservoir features.

Well tests are mandatory for regulatory compliance to validate the in-house production test result, determine production allocation and evaluate reserves. The campaign kicked off in April 2019. So far 24 wells have been tested, and the project is still ongoing. Previously, BOG has embarked on other Well Testing campaigns for Neconde Energy.

Neconde Odidi Field is one of the 7 fields under OML 42 and it is located in West Delta, South-South Nigeria. The field was developed by a joint venture between Shell Petroleum Development Company (SPDC) and Nigerian National Petroleum Corporation (NNPC). SPDC latter divested its 45 per cent interest to Neconde Energy Limited, while the remaining 55 per cent interest belonging to the NNPC, was assigned to the NPDC, an exploration and production subsidiary of the NNPC. Odidi field is now a joint venture between Neconde Energy and NPDC.

A major new development in Odidi Field is the alternative evacuation route for crude via barging to the Ugo Ocha Export Terminal instead of the initial Trans Forcados Pipeline (TFP). This development has necessitated the implementation of oil and water treatments plants which will see BOG deploying its expertise in rotating equipment.

BOG Multi-Phase Flow Meters (MPFMs) have been successfully deployed to test wells for Total, ExxonMobil, Agip, Seplat, Heritage Oil, Belemaoil, NPDC in addition to the recent tests at Neconde.

BOG’s engineers operating the choke manifold and bypass manifold during the ongoing Well Testing Campaign at Neconde Energy’s Odidi Field.


All Updates


CEO’s Message on Worker’s Day
Posted on Friday, May 1, 2020


FOCUS OF MILTON ROY
Posted on Saturday, April 11, 2020


Sundyne and BOG on Sales Visits
Posted on


Offshore/Onshore Hose Assembly Services for Total E&P
Posted on


Collaboration with Expro on Asasa Field
Posted on


BOG Embarks on Exxon Mobil-Usan Shutdown Project
Posted on


BOG Achieves Integrated Management System (IMS) Certification
Posted on Friday, April 10, 2020


SON-MSC Organizes Stakeholders’ Forum
Posted on


Chevron Contractors Line Management Safety Forum
Posted on


Rivers State Environmental Health & Safety Officials Commend BOG
Posted on


Milton Roy/BOG Training in France
Posted on


BOG Conducts Trainings and Maintenance at NLNG
Posted on


BOG and MiIton Roy in Partnership for Africa’s First Authorized Service Center(ASC)
Posted on


CEO’s Message on Corona Virus
Posted on Thursday, March 26, 2020


The BOG Woman- Yemi Gbeja
Posted on Friday, March 13, 2020


Diversity and Inclusion in the Oil and Gas Industry – Azuka Onyia
Posted on Wednesday, March 11, 2020


Bell Oil & Gas (BOG) Conducts a Scoping Workshop for her Proposed Pipe Threading and Valve Assembly Production Facilities
Posted on Wednesday, February 5, 2020


Staff Periodic Awards and Recognition – 2020
Posted on Tuesday, February 4, 2020


OMB Valves
Posted on Tuesday, December 31, 2019


CEO’s END OF YEAR MESSAGE-2019: An Exhilarating Year
Posted on Monday, December 30, 2019


Training: Championing the Development of a Highly Skilled Work Force
Posted on


Employees Take Centre Stage with Employee Value Proposistion (EVP) Initiative
Posted on


Total Overhaul of Sundyne Gas Compressor at Greenville LNG
Posted on


BOG Strengthens Partnership with Milton Roy
Posted on


Composite Pipe Systems Workshop In Lagos and Port Harcourt
Posted on


SUNDYNE Visit
Posted on


PHRC Visit
Posted on


BOG Scales Through First Phase of Integrated Management System (IMS) Audit
Posted on


Nigerian Content Development and Monitoring Board (NCDMB) Inspects BOG Facilities
Posted on


Chinese Joint Venture Partners Visit BOG’s Proposed Multi-Million Dollar Facility
Posted on