ID: 1
Year Completed: On going
Project: Corrosion Control Services in OML 124 Field Onshore
Type of work: Provision of corrosion control services in OML 124 Field Onshore. Surface Preparation, Surface Cleaning, Blasting & Coating
Client: Addax Petroleum Development (Nigeria) Limited
ID: 2
Year Completed: On going
Project: Supply of Pipes
Type of work: Supply of pipes for flare out project
Client: Chevron Nigeria Limited
ID: 3
Year Completed: On going
Project: Intraplant Project
Type of work: Supply & Installation of GRE Pipes
Client: Chevron Nigeria Limited
ID: 4
Year Completed: On going
Project: Supply of pipes
Type of work: Supply of pipes for for intraplant corridor project
Client: Chevron Nigeria Limited
ID: 5
Year Completed: On going
Project: Instrumentation Supply Agreement
Type of work: Stocking of Parker and Autoclave Engineers fittings
Client: Cooper Cameron
ID: 6
Year Completed: On going
Project: Repair of GRE Lines at Amenam
Type of work: Procurement and Installation of GRE pipes
Client: Elf Petroleum Nigeria Ltd
ID: 7
Year Completed: On going
Project: Installation of GRE Pipes
Type of work: Conversion of CuNi to GRE
Client: Elf Petroleum Nigeria Ltd
ID: 8
Year Completed: On going
Project: Repairs of GRE Pipes
Type of work: Repair and supply of GRE Pipes and Fittings
Client: Elf Petroleum Nigeria Ltd
ID: 9
Year Completed: On going
Project: Usari C Water-lines
Type of work: Re-routing of Usari C 8" Fire Water line
Client: Mobil Producing Nigeria Unlimited
ID: 10
Year Completed: On going
Project: Blanket Purchase Agreement/Stock Holding
Type of work: 3-year Frame Agreement for Supply of Parker Instrumentation Products
Client: Mobil Producing Nigeria Unlimited
ID: 11
Year Completed: On going
Project: Blanket Purchase Agreement/Stock Holding
Type of work: 3-year Frame Agreement for Supply of Sundstrand Pumps & Compressor Products
Client: Mobil Producing Nigeria Unlimited
ID: 12
Year Completed: On going
Project: Provision of Wellhead Maintenance Services
Type of work: Provision of specialist Wellhead Maintenance Services to maintain the integrity of wells in the land, swamp and offshore operation areas of the SPDC eastern and western operations consisting of approximately 700 oil wellheads and 50 gas wellheads of various sizes. Scheduled wellhead integrity testing, greasing and repairs.
Client: Shell Petroleum Development Company
ID: 13
Year Completed: 2007
Project: OML 123 Integrated Facilities Upgrade Project - Line Pipes & Bends
Type of work: Major supply of line pipes and bends for OML 123 Integrated Facilities Upgrade Project
Client: Addax Petroleum Development (Nigeria) Limited
ID: 14
Year Completed: 2007
Project: Interconection of 12" GRE Cooling Water System
Type of work: Interconection of 12" GRE Cooling Water System on FSO Unity
Client: Total Upstream Nigeria Limited
ID: 15
Year Completed: 2007
Project: TCG Spool Conversion
Type of work: TCG Spool Conversion on Amenam Platform (AMP2)
Client: Total Upstream Nigeria Limited
ID: 16
Year Completed: 2007
Project: Repair of HMD Kontro Pump
Type of work: Repair of HMD Kontro Pump on FSO Unity
Client: Total Upstream Nigeria Limited
ID: 17
Year Completed: 2007
Project: Instrumentation Supply Agreement
Type of work: Stocking of Parker and Autoclave Engineers fittings
Client: Vetco Gray
ID: 18
Year Completed: 2007
Project: Rehabilitation of FCC Feed Storage Tank 301-TK-48
Type of work: Storage Tank Rehabilitation – Blasting, Painting and Evacuation
Client: Warri Refining and Petrochemical Company Limited (WRPC)
ID: 19
Year Completed: 2006
Project: Supply of Stand Alone Dynamic UPD Systems
Type of work: Supply of Stand Alone Dynamic UPD Systems
Client: Chevron Nigeria Limited
ID: 20
Year Completed: 2006
Project: Installation of Pipes & Valves - Ofon Platform
Type of work: Replacement of CuNi pipes with GRE pipes and installation valves on Ofon Platform
Client: Elf Petroleum Nigeria Ltd
ID: 21
Year Completed: 2006
Project: Repair of GRE Pipes - FSO Unity
Type of work: Repair of GRE Pipes & replacement of pipes and elbows on FSO Unity
Client: Elf Petroleum Nigeria Ltd
ID: 22
Year Completed: 2006
Project: Repair of Sundyne Pump Gear Box
Type of work: Inspection, repair & supply of parts for Sundyne Pump Gear Box
Client: Nigeria LNG Ltd (NLNG)
ID: 23
Year Completed: 2006
Project: Compressor Repair - Soku Gas Plant
Type of work: Supply & Installation of Spares to repair Sundyne LMC 331F Compressor on Soku Gas Plant
Client: Shell
ID: 24
Year Completed: 2006
Project: Supply of Line Pipes
Type of work: Procurement and coating of Line Pipes
Client: Total Upstream Nigeria Limited
ID: 25
Year Completed: 2006
Project: Rehabilitation of Fuel Oil Storage Tank 301-TK-45
Type of work: Tank Rehabilitation – Blasting, Painting and Evacuation
Client: Warri Refining and Petrochemical Company Limited (WRPC)
ID: 26
Year Completed: 2005
Project: SNEPCO Bonga FPSO – Topsides Integration
Type of work: Supply & Installation of Instrumentation (Control Tubing)
Client: Amec Contractors (West Africa) Limited
ID: 27
Year Completed: 2005
Project: SNEPCO Bonga FPSO – Topsides Integration
Type of work: Installation & Repair of GRE pipes
Client: Amec Contractors (West Africa) Limited
ID: 28
Year Completed: 2005
Project: SNEPCO Bonga FPSO – Topsides Integration &
Type of work: GRE Pipes Work: Supply, installation, & Leak Repairs
Client: Amec Contractors (West Africa) Limited
ID: 29
Year Completed: 2005
Project: Supply & Installation of GRE Lines - Amenam Platform
Type of work: Repair of GRE Lines
Client: Elf Petroleum Nigeria Limited
ID: 30
Year Completed: 2005
Project: Repair of GRE Lines - Amenam Platform
Type of work: Supply, installation & repair of GRE Lines
Client: Elf Petroleum Nigeria Limited
ID: 31
Year Completed: 2005
Project: GRE Pipes Work: Supply, installation, & Leak Repairs
Type of work: Supply, installation & repair of GRE Lines
Client: Elf Petroleum Nigeria Limited
ID: 32
Year Completed: 2005
Project: Repair of GRE Lines - Amenam Platform
Type of work: Installation and repair of GRE pipes
Client: Elf Petroleum Nigeria Limited
ID: 33
Year Completed: 2004
Project: SNEPCO Bonga FPSO – Topsides Integration
Type of work: Supply, Installation & Repair of GRE pipes
Client: Amec Contractors (West Africa) Limited
ID: 34
Year Completed: 2004
Project: Rehabilitation of FCC Feed Storage Tank 301-TK-47
Type of work: Storage Tank Rehabilitation – Blasting, Painting and Evacuation
Client: Warri Refining and Petrochemical Company Limited (WRPC)
Home
About Us
Products&Services
Technical Partners
Management Team
Recent Projects
Careers
Contact Us
Home | About Us | Products&Services | Technical Partners | Management Team
Recent Projects | Careers | Contact Us
Copyright © 2006 Bell Oil & Gas. All Rights Reserved.