| ID: |  | 1 |
| Year Completed: |  | On going |
| Project: |  | Installation of Fibreglass Piping on ExxonMobil GN Platform |
| Type of work: |  | Supply, Fabrication & Installation Installation of GRE (fiberglass) piping on ExxonMobil GN platform |
| Client: |  | Acergy |
 |
 |
 |
| ID: |  | 2 |
| Year Completed: |  | On going |
| Project: |  | Early Production Support - Provision of Crude Storage Tank and Trailers |
| Type of work: |  | Provision of 8Nos 500barrels each of Crude Oil Storage Tanks, 2Nos heavy duty pump, 1No flowmeter and 6Nos crude haulage Trailers |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 3 |
| Year Completed: |  | On going |
| Project: |  | Delta South Project |
| Type of work: |  | Fabrication & Installation of GRE Pipes |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 4 |
| Year Completed: |  | On going |
| Project: |  | Intraplant Project |
| Type of work: |  | Fabrication & Installation of GRE/Line pipes for interplant corridor project |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 5 |
| Year Completed: |  | On going |
| Project: |  | Instrumentation Supply Agreement |
| Type of work: |  | Stocking of Parker and Autoclave Engineers fittings |
| Client: |  | Cooper Cameron |
 |
 |
 |
| ID: |  | 6 |
| Year Completed: |  | On going |
| Project: |  | Operation & Maintenance of Loading Arms |
| Type of work: |  | 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty. Stocking of spares for maintenance. |
| Client: |  | Julius Berger Nigeria Ltd |
 |
 |
 |
| ID: |  | 7 |
| Year Completed: |  | On going |
| Project: |  | Repair of Loading Arms - Bonny River Terminal |
| Type of work: |  | Procurement & Complete Overhaul & Maintenance of MPN NGL Plant, Hydraulic & Gas Operated Loading Arms |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 8 |
| Year Completed: |  | On going |
| Project: |  | Blanket Purchase Agreement/Stock Holding |
| Type of work: |  | 3-year Frame Agreement for Supply of Sundstrand Pumps & Compressor Products |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 9 |
| Year Completed: |  | On going |
| Project: |  | Blanket Purchase Agreement/Stock Holding |
| Type of work: |  | 3-year Frame Agreement for Supply of Parker Instrumentation Products |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 10 |
| Year Completed: |  | On going |
| Project: |  | Provision of PROVERLOOP |
| Type of work: |  | Supply, Installation & Commissioning of FMC Prover Loop |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 11 |
| Year Completed: |  | On going |
| Project: |  | Well Testing |
| Type of work: |  | Multiphase Well Testing |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 12 |
| Year Completed: |  | On going |
| Project: |  | 5-Year Pump Maintenance Contract |
| Type of work: |  | Inspection, repair and maintenance of a range of Sundyne pumps |
| Client: |  | NLNG |
 |
 |
 |
| ID: |  | 13 |
| Year Completed: |  | On going |
| Project: |  | Provision of Wellhead Maintenance Services |
| Type of work: |  | Provision of specialist Wellhead Maintenance Services to maintain the integrity of wells in the land, swamp and offshore operation areas of the SPDC eastern and western operations consisting of approximately 700 oil wellheads and 50 gas wellheads of various sizes. Scheduled wellhead integrity testing, greasing and repairs. |
| Client: |  | Shell Petroleum Development Company |
 |
 |
 |
| ID: |  | 14 |
| Year Completed: |  | On going |
| Project: |  | Survey and Repairs of Water Injection System, Flanges and Pipes - Agbami FPSO |
| Type of work: |  | • Engineering Studies and AS-Built documentation of the GRE/GRP system
• Structural Support evaluation of current support system on the AGBAMI FPSO
• Fabrication of new GRE/GRP spools or Lines based on Isometric drawings or design
• Installation of fabricated spool
• Repairs and replacement of faulty or ruptured GRE/GRP Lines
• Structural support design and general fabrication and installation of support and accessories
• Painting of structural support, GRE pipes and structural works on the FPSO
• Pressure testing of fabricated, repaired or installed GRE/GRP Spool
• Commissioning of installed GRE/GRP lines
• Scaffolding
• Rope Access
• Procurement of GRE/GRP pipes, fittings, gaskets, bolts and nuts and general consumables
• Stacking and Storage of GRE Pipes, fittings, consumables
• Provision of security and handling of GRE/GRP materials
|
| Client: |  | Star Deep Water Petroleum |
 |
 |
 |
| ID: |  | 15 |
| Year Completed: |  | 2010 |
| Project: |  | Specialist Cleaning of Platform - OML 123 |
| Type of work: |  | Cleaning, blasting & coating of Platforms: Helideck, Boat Landings, Christmas Trees, Process Facilities, Manifiolds, Deck Fllo, and other areas |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 16 |
| Year Completed: |  | 2010 |
| Project: |  | Condition Monitoring |
| Type of work: |  | Condition Monitoring & Assessment of Ingersoll Rand Compressors in all Mobil facilities |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 17 |
| Year Completed: |  | 2010 |
| Project: |  | Supply of Linepipes |
| Type of work: |  | Supply of 70KM 4" & 6" Bare and 3 Layer PE Coated Schedule 80 API 5L X 52 Seamless Line Pipes |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 18 |
| Year Completed: |  | 2010 |
| Project: |  | Supply of Linepipes |
| Type of work: |  | Supply of 59KM 4" 3 Layer PE Coated Schedule 80 API 5L X 52 Seamless Line Pipes |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 19 |
| Year Completed: |  | 2010 |
| Project: |  | Provision of Multi-phase Flowmeter for Well Testing Campaign in Land and Swamp Wells |
| Type of work: |  | Multiphase Well Testing of 8 wells: Obk16SS, 16LS, Obf14LS, 15T, 35SS, 35LS, 37SS & 37LS |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 20 |
| Year Completed: |  | 2010 |
| Project: |  | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp Wells |
| Type of work: |  | Multiphase Well Testing of five wells: OBF36T, UMR4T, UMR5T, UMR6T & IDU7T |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 21 |
| Year Completed: |  | 2010 |
| Project: |  | Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp Wells |
| Type of work: |  | Multiphase Well Testing of three wells: KWL3SS, KWL11SS & KWL11LS |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 22 |
| Year Completed: |  | 2010 |
| Project: |  | Repairs and Maintenance of Water Line (GRE) - Akpo FPSO |
| Type of work: |  | Repairs and maintenance of GRE waterline: 1. 8Nos 6" GRE repair on sea water sand filter A - H, 2. 30" GRE TEE repair on 42" sea water overboard line, 3. 3" & 4" GRE repair on S4 & P4 Fire Hydrant Lines, 4. Repair of 14" (14x10 reducer) GRE line on fire pump A |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 23 |
| Year Completed: |  | 2010 |
| Project: |  | Repair of broken Chlorination Unit Discharge Spool - Amenam Platform |
| Type of work: |  | Onshore fabrication and offshore installation of broken CPVC pipes |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 24 |
| Year Completed: |  | 2010 |
| Project: |  | Repair of Broken Chlorination Unit Discharge Spool |
| Type of work: |  | Onshore fabrication and offshore installation of broken CPVC pipes |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 25 |
| Year Completed: |  | 2010 |
| Project: |  | Repair of Fire Water Line |
| Type of work: |  | Fabrication, installation and repair of 12" Fire Water Line (GRE) |
| Client: |  | Warri Refining & Petrochemical Company |
 |
 |
 |
| ID: |  | 26 |
| Year Completed: |  | 2010 |
| Project: |  | Repair of GRE Lines & Valve Change-Out |
| Type of work: |  | Repair, fabrication and installation of 10" and 12" Fire Water Lines (GRE) and Change-Out of valves |
| Client: |  | Warri Refining & Petrochemical Company (WRPC) |
 |
 |
 |
| ID: |  | 27 |
| Year Completed: |  | 2009 |
| Project: |  | Corrosion Control Services in OML 124 |
| Type of work: |  | Surface Protection, surface cleaning, blasting & Coating |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 28 |
| Year Completed: |  | 2009 |
| Project: |  | Corrosion Control Services |
| Type of work: |  | Corrosion Removal and Protection on Ebughu Platform Helideck Underside |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 29 |
| Year Completed: |  | 2009 |
| Project: |  | QC Services for OPL 286 Seismic Acquisition Programme |
| Type of work: |  | Call-Off contract for the provision of QC Services for OPL 286 Seismic Acquisition Programme. |
| Client: |  | BG Group |
 |
 |
 |
| ID: |  | 30 |
| Year Completed: |  | 2009 |
| Project: |  | Obite/Ogbagi Repair Works |
| Type of work: |  | Repair of Ruptured OGP fifi lines for Hydrant No 11 & 13 |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 31 |
| Year Completed: |  | 2009 |
| Project: |  | Repair of GRE Lines at Amenam |
| Type of work: |  | Procurement and Installation of GRE pipes |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 32 |
| Year Completed: |  | 2009 |
| Project: |  | Corrosion Control |
| Type of work: |  | External protection of structures and equipment by painting - Maintenance works |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 33 |
| Year Completed: |  | 2009 |
| Project: |  | Repair of GRE Lines |
| Type of work: |  | Repair of GRE lines on Amenam |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 34 |
| Year Completed: |  | 2009 |
| Project: |  | GRE Coating - Adanga |
| Type of work: |  | Coating/wrapping of steel pipe with GRE material |
| Client: |  | Fred Olsen |
 |
 |
 |
| ID: |  | 35 |
| Year Completed: |  | 2009 |
| Project: |  | Repair of GRE Pipes on ERHA FPSO |
| Type of work: |  | Inspection, survey, fabrication and repair of 40" x 24" GRE lines |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 36 |
| Year Completed: |  | 2009 |
| Project: |  | Usari Phases 1,2,3 |
| Type of work: |  | Repair, Installation & Testing of Firewater GRE Lines |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 37 |
| Year Completed: |  | 2009 |
| Project: |  | Seismic QA/QC Services for ERHA FPSO |
| Type of work: |  | Provision of Seismic QA/QC Services for ERHA 4D Monitor |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 38 |
| Year Completed: |  | 2009 |
| Project: |  | Supply of Linepipes |
| Type of work: |  | Supply of 6" Schedule 80, 3 Layer PE Coated Seamless Line Pipes, API 5L X 52 Bore Pipes With Random Length of 12MTRS per length with 10.9MM thickness |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 39 |
| Year Completed: |  | 2009 |
| Project: |  | Provision of Multiphase Flow Meter Well Testing |
| Type of work: |  | Multiphase Well Testing of five wells: Ebg 2LS, Ebg 5LS, Ebg 5SS, Obf 25LS and Obf 23LS Wells |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 40 |
| Year Completed: |  | 2009 |
| Project: |  | Overhaul of Pumps |
| Type of work: |  | Inspection, Trouble shooting and Overhaul of several Sundyne LMV 311Z and LMV 331 pumps |
| Client: |  | NLNG |
 |
 |
 |
| ID: |  | 41 |
| Year Completed: |  | 2009 |
| Project: |  | GRE Work on BONGA FPSO |
| Type of work: |  | Inspection, repair and fabrication of 40" x 24" lines |
| Client: |  | SNEPCO |
 |
 |
 |
| ID: |  | 42 |
| Year Completed: |  | 2009 |
| Project: |  | GRE Repairs & Valve Change-Out |
| Type of work: |  | Repair, fabrication and installation of 10" and 12" GRE Lines and Change-Out of valves |
| Client: |  | Warri Refining & Petrochemical Company (WRPC) |
 |
 |
 |
| ID: |  | 43 |
| Year Completed: |  | 2008 |
| Project: |  | Corrosion Control Services in OML 124 Field Onshore |
| Type of work: |  | Provision of corrosion control services in OML 124 Field Onshore. Surface Preparation, Surface Cleaning, Blasting & Coating |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 44 |
| Year Completed: |  | 2008 |
| Project: |  | Intraplant Project |
| Type of work: |  | Supply of steel pipes for intraplant corridor project |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 45 |
| Year Completed: |  | 2008 |
| Project: |  | Delta South Project |
| Type of work: |  | Supply of GRE/Line Pipes - Delta South Project |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 46 |
| Year Completed: |  | 2008 |
| Project: |  | Supply of Pipes |
| Type of work: |  | Supply of steel pipes for flare out project |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 47 |
| Year Completed: |  | 2008 |
| Project: |  | Intraplant Project |
| Type of work: |  | Supply of GRE Pipes |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 48 |
| Year Completed: |  | 2008 |
| Project: |  | GRE Maintenance - BONGA FPSO |
| Type of work: |  | Brownfield Maintenance & Engineering POP - GRE pipe work |
| Client: |  | Dorman Long Engineering Ltd |
 |
 |
 |
| ID: |  | 49 |
| Year Completed: |  | 2008 |
| Project: |  | Installation of GRE Pipes |
| Type of work: |  | Conversion of CuNi to GRE |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 50 |
| Year Completed: |  | 2008 |
| Project: |  | Repairs of GRE Pipes |
| Type of work: |  | Repair and supply of GRE Pipes and Fittings |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 51 |
| Year Completed: |  | 2008 |
| Project: |  | Offshore Repair & Maintenance Work |
| Type of work: |  | Repairs and maintenance of various GRE lines on Amenam Platform - Offshore |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 52 |
| Year Completed: |  | 2008 |
| Project: |  | Usari C Water-Lines Rerouting |
| Type of work: |  | Re-routing of C 8" Fire Water line on Usari Platform |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 53 |
| Year Completed: |  | 2008 |
| Project: |  | Provision of Air Compressor |
| Type of work: |  | Provision of Turbo Screw Compressor |
| Client: |  | Nigeria Agip Oil Company |
 |
 |
 |
| ID: |  | 54 |
| Year Completed: |  | 2008 |
| Project: |  | Overhaul & Installation |
| Type of work: |  | Overhaul and Installation of LMV 331 and LMV 311 Sundyne Pumps |
| Client: |  | NLNG |
 |
 |
 |
| ID: |  | 55 |
| Year Completed: |  | 2007 |
| Project: |  | OML 123 Integrated Facilities Upgrade Project - Line Pipes & Bends |
| Type of work: |  | Major supply of line pipes and bends for OML 123 Integrated Facilities Upgrade Project |
| Client: |  | Addax Petroleum Development (Nigeria) Limited |
 |
 |
 |
| ID: |  | 56 |
| Year Completed: |  | 2007 |
| Project: |  | Chemical Cleaning - Amenam Platform |
| Type of work: |  | Chemical Cleaning of Hydro Cyclone and Heat Exchangers on Amenam Platform - Offshore |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 57 |
| Year Completed: |  | 2007 |
| Project: |  | Provision of Pumps |
| Type of work: |  | Supply & Installation of Sundyne centrifugal pumps LMV 322 |
| Client: |  | Mobil Producing Nigeria Unlimited |
 |
 |
 |
| ID: |  | 58 |
| Year Completed: |  | 2007 |
| Project: |  | TCG Spool Conversion |
| Type of work: |  | TCG Spool Conversion on Amenam Platform (AMP2) |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 59 |
| Year Completed: |  | 2007 |
| Project: |  | Interconection of 12" GRE Cooling Water System |
| Type of work: |  | Interconection of 12" GRE Cooling Water System on FSO Unity |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 60 |
| Year Completed: |  | 2007 |
| Project: |  | Repair of HMD Kontro Pump |
| Type of work: |  | Repair of HMD Kontro Pump on FSO Unity |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 61 |
| Year Completed: |  | 2007 |
| Project: |  | Instrumentation Supply Agreement |
| Type of work: |  | Stocking of Parker and Autoclave Engineers fittings |
| Client: |  | Vetco Gray |
 |
 |
 |
| ID: |  | 62 |
| Year Completed: |  | 2007 |
| Project: |  | Rehabilitation of FCC Feed Storage Tank 301-TK-48 |
| Type of work: |  | Storage Tank Rehabilitation – Blasting, Painting and Evacuation |
| Client: |  | Warri Refining and Petrochemical Company Limited (WRPC) |
 |
 |
 |
| ID: |  | 63 |
| Year Completed: |  | 2006 |
| Project: |  | Supply of Stand Alone Dynamic UPD Systems |
| Type of work: |  | Supply of Stand Alone Dynamic UPD Systems |
| Client: |  | Chevron Nigeria Limited |
 |
 |
 |
| ID: |  | 64 |
| Year Completed: |  | 2006 |
| Project: |  | Installation of Pipes & Valves - Ofon Platform |
| Type of work: |  | Replacement of CuNi pipes with GRE pipes and installation valves on Ofon Platform |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 65 |
| Year Completed: |  | 2006 |
| Project: |  | Repair of GRE Pipes - FSO Unity |
| Type of work: |  | Repair of GRE Pipes & replacement of pipes and elbows on FSO Unity |
| Client: |  | Elf Petroleum Nigeria Ltd |
 |
 |
 |
| ID: |  | 66 |
| Year Completed: |  | 2006 |
| Project: |  | Repair of Sundyne Pump Gear Box |
| Type of work: |  | Inspection, repair & supply of parts for Sundyne Pump Gear Box |
| Client: |  | Nigeria LNG Ltd (NLNG) |
 |
 |
 |
| ID: |  | 67 |
| Year Completed: |  | 2006 |
| Project: |  | Compressor Repair - Soku Gas Plant |
| Type of work: |  | Supply & Installation of Spares to repair Sundyne LMC 331F Compressor on Soku Gas Plant |
| Client: |  | Shell |
 |
 |
 |
| ID: |  | 68 |
| Year Completed: |  | 2006 |
| Project: |  | Supply of Line Pipes |
| Type of work: |  | Procurement and coating of Line Pipes |
| Client: |  | Total Upstream Nigeria Limited |
 |
 |
 |
| ID: |  | 69 |
| Year Completed: |  | 2006 |
| Project: |  | Rehabilitation of Fuel Oil Storage Tank 301-TK-45 |
| Type of work: |  | Tank Rehabilitation – Blasting, Painting and Evacuation |
| Client: |  | Warri Refining and Petrochemical Company Limited (WRPC) |
 |
 |
 |
| ID: |  | 70 |
| Year Completed: |  | 2005 |
| Project: |  | SNEPCO Bonga FPSO – Topsides Integration |
| Type of work: |  | Installation & Repair of GRE pipes |
| Client: |  | Amec Contractors (West Africa) Limited |
 |
 |
 |
| ID: |  | 71 |
| Year Completed: |  | 2005 |
| Project: |  | SNEPCO Bonga FPSO – Topsides Integration & |
| Type of work: |  | GRE Pipes Work: Supply, installation, & Leak Repairs |
| Client: |  | Amec Contractors (West Africa) Limited |
 |
 |
 |
| ID: |  | 72 |
| Year Completed: |  | 2005 |
| Project: |  | SNEPCO Bonga FPSO – Topsides Integration |
| Type of work: |  | Supply & Installation of Instrumentation (Control Tubing) |
| Client: |  | Amec Contractors (West Africa) Limited |
 |
 |
 |
| ID: |  | 73 |
| Year Completed: |  | 2005 |
| Project: |  | Repair of GRE Lines - Amenam Platform |
| Type of work: |  | Installation and repair of GRE pipes |
| Client: |  | Elf Petroleum Nigeria Limited |
 |
 |
 |
| ID: |  | 74 |
| Year Completed: |  | 2005 |
| Project: |  | Supply & Installation of GRE Lines - Amenam Platform |
| Type of work: |  | Repair of GRE Lines |
| Client: |  | Elf Petroleum Nigeria Limited |
 |
 |
 |
| ID: |  | 75 |
| Year Completed: |  | 2005 |
| Project: |  | Repair of GRE Lines - Amenam Platform |
| Type of work: |  | Supply, installation & repair of GRE Lines |
| Client: |  | Elf Petroleum Nigeria Limited |
 |
 |
 |
| ID: |  | 76 |
| Year Completed: |  | 2005 |
| Project: |  | GRE Pipes Work: Supply, installation, & Leak Repairs |
| Type of work: |  | Supply, installation & repair of GRE Lines |
| Client: |  | Elf Petroleum Nigeria Limited |
 |
 |
 |
| ID: |  | 77 |
| Year Completed: |  | 2004 |
| Project: |  | SNEPCO Bonga FPSO – Topsides Integration |
| Type of work: |  | Supply, Installation & Repair of GRE pipes |
| Client: |  | Amec Contractors (West Africa) Limited |
 |
 |
 |
| ID: |  | 78 |
| Year Completed: |  | 2004 |
| Project: |  | Rehabilitation of FCC Feed Storage Tank 301-TK-47 |
| Type of work: |  | Storage Tank Rehabilitation – Blasting, Painting and Evacuation |
| Client: |  | Warri Refining and Petrochemical Company Limited (WRPC) |
 |
 |
 |