News and Updates
FOCUS OF MILTON ROY

What the Company Does

Milton Roy(MR) specialises in manufacturing/ production of chemical injection pumps (electrically and pneumatically driven), mixers, side entry mixers, chemical injection skids and gas odorization systems.

Milton Roy is based in France. The company has factories in locations around the world (United States of America, UAE(Dubai), India and China).

 

BOG’s Relationship with Milton Roy

Bell Oil & Gas is the sole channel partner of Milton Roy in Nigeria and is set to have an accredited service center for the company in Africa.

The relationship between Milton Roy and BOG is mutually beneficial. Over the years BOG has been able to expand the market scope of Milton Roy by ensuring the presence of MR pumps on platforms of the IOCs, Marginal operators, Refineries and Process companies in Nigeria. This has generated rapid sales growth and profit.

 

Details about products and services

Milton Roy offers the following products and services

  • Chemical Injection pumps
  • Chemical injection skids

Chemical Injection Skids 

  • Mixers
  • Side -entry mixers

Side -entry mixers

  • Gas odorization system

 

Gas odorization system

  • Aftermarket support (installation, commissioning, repair and maintenance)

 

Technology & Applications

The latest innovation of Milton Roy is the PrimeRoyal X and the Mega Royal diaphragm processing series. The Prime-Royal X was recently inculcated into the Prime-Royal family. It is designed to provide accuracy in the most challenging environment (up to 20,000psi (1,372 bar).

Prime-Royal Pump

The Mega-Royal is a pump certified with API 675 and API 674 standards. It has same drive as the Power Royal pumps (API 674) and the liquid end is diaphragm with hydraulic oil command and internal safety valve as per API 675. It is used for high pressure liquid injection and transfer in Petro-chemical process applications and other key industries.

Mil-Royal pump

 

Standards and Quality

MR has put in place processes to achieve excellence in customer service delivery. The processes include:

Cost Estimation Competence: This has to do with meeting customers expectations. It provides in-depth study of project: Highlighting the specifications, guidelines, assessments and pre-clarifications. This also ensures that offers are submitted without delay using specialist software developed by Milton Roy for cost assessment.

Design Engineering Competence: This is essential for package manufacturing, the general arrangement drawings, P&ID’s, detailed and isometrics drawings are executed using powerful softwares (Unigraphics and AutoCAD).

Project Management Competence: Beginning with the receipt of the purchase order and at each step of the project. Milton Roy project engineers provide specific responses to all questions. In their role as advisors and experts. They support the project from start to completion and delivery, including inspections and trails, thus ensuring the success.

Purchase Department Competence: The purchase department competence is made up of  technical purchasers who submit all contractual specifications to sub-contractors and suppliers thereby, ensuring compliance to technical specifications. This team also manages a panel of best level suppliers recommended by Milton Roy or prescribed by contract provisions. Contractual Documentation Competence: This is a value-added service and an essential element of the contract.

 


All Updates


BOG FZE Construction Progresses
Posted on Sunday, April 25, 2021


Milton Roy Side Entry Mixers
Posted on


GRE Repairs On Chevron’s Agbami FPSO
Posted on


GRE Repair and Installation On ERHA FPSO
Posted on


GRE Piping Repair on Etim Platform
Posted on


Installation of HPM Motor Drive At CHI Limited
Posted on


Growth In Nigeria General Industry Sector: What Is Required?
Posted on


BOG Celebrates International Women ‘s Day
Posted on


What I Learnt From BOG’s International Women’s Day Webinar
Posted on


Alliance Classification in the Nigerian Oil & Gas Industry
Posted on Sunday, February 14, 2021


The Human Capacity Dearth in the Nigerian Oil & Gas Industry
Posted on Tuesday, January 5, 2021


Building Resilience in the Workplace In Turbulent Times
Posted on


Construction Commences on BOG’s Multi-Million Dollar Facility
Posted on


Product Focus-Axial Isolation & Control Valves
Posted on


Commissioning Sundyne Gas Compressor at Greenville LNG
Posted on


Fabrication for Total’s Unity FSO
Posted on


IMS Internal Audit
Posted on


Total E&P And Sudelettra Audit/ Inspections for the Ikike GRE Campaign
Posted on Monday, January 4, 2021


WHY YOU SHOULD CHOOSE HAIMO MULTIPHASE METER
Posted on Sunday, November 15, 2020


What You Need to Know About Goodwin Axial Isolation Valves
Posted on Sunday, November 8, 2020


BOG Holds Groundbreaking Ceremony for Multimillion Dollar Facility
Posted on Thursday, October 22, 2020


Changing the Narrative of Nigerian Businesses
Posted on


UF RACK Repair for Total E&P
Posted on


GRE Repair on ERHA FPSO
Posted on Monday, October 19, 2020


GRE Repair on USAN FPSO
Posted on


Filter Spools Fabrication for Total E&P
Posted on


8000 Hours Service of 4units of Ingersoll Rand Rs30i Compressors
Posted on Sunday, October 18, 2020


Commissioning of Sundyne Pump at NLNG
Posted on


The Secrets of Milton Roy’s Success in Africa
Posted on


NCDMB’s Executive Secretary Speech at BOG’s Groundbreaking Ceremony
Posted on