News and Updates
Commissioning of Sundyne Pump at NLNG

 

BOG RE Engineer, (Second right) at NLNG

BOG Rotating Equipment (RE) engineers were mobilized to commission the Sundyne transfer pump 1p 2571b on train one at Nigeria Liquefied Natural Gas Ltd (NLNG) on Bonny Island from August 26th to 30th.The commission process w a s d o n e  i n  l i n e w i t h S u n d y n e ‘s recommendations. BOG is the exclusive representative of Sundyne in Nigeria.

The Sundyne pump is an API pump designed with cryogenic material that can withstand low-temperature fluid transfer like liquefied natural gas and it’s equivalent. Sundyne pump is known for its durability and maintenance cost-effectiveness.

BOG has over 15 years’ experience in the provision and maintenance of rotating equipment in the upstream oil and gas sector. The company’s aftermarket services include spare parts, overhaul, repair, engineering and technical support.


All Updates


BOG’s Pipe Threading, Machining and Valve Assembly Facility Nears Completion
Posted on Sunday, August 1, 2021


BOG Partners with JCI to offer World-Class Fire Safety Services and Technologies
Posted on


Overhaul of Sundyne Pump at NLNG Bonny Island
Posted on


Troubleshooting of Ingersoll Rand Compressor on Total Ofon Platform
Posted on


BOG Collaborates With Global OEMs to Boost Local Content Development In Nigeria
Posted on


NCDMB Awards Category A Certificates to BOG
Posted on


BOG FZE Construction Progresses
Posted on Sunday, April 25, 2021


Milton Roy Side Entry Mixers
Posted on


GRE Repairs On Chevron’s Agbami FPSO
Posted on


GRE Repair and Installation On ERHA FPSO
Posted on


GRE Piping Repair on Etim Platform
Posted on


Installation of HPM Motor Drive At CHI Limited
Posted on


Growth In Nigeria General Industry Sector: What Is Required?
Posted on


BOG Celebrates International Women ‘s Day
Posted on


What I Learnt From BOG’s International Women’s Day Webinar
Posted on


Alliance Classification in the Nigerian Oil & Gas Industry
Posted on Sunday, February 14, 2021


The Human Capacity Dearth in the Nigerian Oil & Gas Industry
Posted on Tuesday, January 5, 2021


Building Resilience in the Workplace In Turbulent Times
Posted on


Construction Commences on BOG’s Multi-Million Dollar Facility
Posted on


Product Focus-Axial Isolation & Control Valves
Posted on


Commissioning Sundyne Gas Compressor at Greenville LNG
Posted on


Fabrication for Total’s Unity FSO
Posted on


IMS Internal Audit
Posted on


Total E&P And Sudelettra Audit/ Inspections for the Ikike GRE Campaign
Posted on Monday, January 4, 2021


WHY YOU SHOULD CHOOSE HAIMO MULTIPHASE METER
Posted on Sunday, November 15, 2020


What You Need to Know About Goodwin Axial Isolation Valves
Posted on Sunday, November 8, 2020


BOG Holds Groundbreaking Ceremony for Multimillion Dollar Facility
Posted on Thursday, October 22, 2020


Changing the Narrative of Nigerian Businesses
Posted on


UF RACK Repair for Total E&P
Posted on


GRE Repair on ERHA FPSO
Posted on Monday, October 19, 2020