2019
Year Completed: Ongoing
Project: Supply of Inhibitor, Corrosion Dosing Pump
Project description Corrosion Inhibitor Dosing Equipment Consisting of Corrosion Inhibitor Storage Tanks
Client: NLNG
Year Completed: Ongoing
Project: Exxon Mobil Ubit Restoration Project – Offshore
Project description Fabrication, installation & testing  Of Pressure Vessels – FRP Piping Scope.
Client: Project Masters Nigeria Limited
Year Completed: Ongoing
Project: Supply of 40″ Pibiviesse Valves
Project description Supply of 4 pieces of 40″ class 900 Pibiviesse Actuated Ball  Valves for Shell/NNPC pipeline project.
Client: SPDC
Year Completed: Ongoing
Project: Exxon Mobil Ubit Restoration Project_Fabrication of Pressure Vessels – Onshore
Project description Purchase and Fabrication Of Pressure Vessels – FRP piping materials (GRE & Copper Nickel).
Client: Aveon
Year Completed: Ongoing
Project: Maintenance of Sundyne Pumps
Project description Maintenance of Sundyne Pumps
Client: NLNG
Year Completed: Ongoing
Project: Supply Of Sundyne Compressor
Project description Supply Of Plug in compressor SN D-C240044-1-a/b/c/d, comprising of gearbox, Mechanical Seal, Diffuser with cover, Process Seal with Seal Housing and Impeller.
Client: Chevron Nigeria Limited
Year Completed: Ongoing
Project: Ingersoll Rand Compressor Services
Project description Configuration & Installation of M145 SGNE controller on IR compressor.
Client: Kimberly Clarke W.A
Year Completed: Ongoing
Project: Maintenance of Ingersoll Rand compressors (5 Units)
Project description The project involves inspection (a pre-service inspection and 16000 hours of maintenance) and repair of safety/service valves with new parts. Other activities include performing functional tests on compressors after service, Pre-installation checks on compressors and ancillaries on site. Following this will be a reinstatement of compressors on site, commissioning and test-run of pumps and post-commissioning checks on the compressors.
Client: Glassforce Nigeria Ltd
Ongoing
Year Completed Supply of  Ingersoll Rand Instrument Air Compressor Package
Project Title Supply of  Ingersoll Rand Instrument Air Compressor Package
Project Description Delta Afrik
Year Completed Ongoing
Project Title Supply of Ingersol Rand Assembly Aftercoolers
Project Description Supply of Ingersol Rand Assembly Aftercoolers
Client SNEPCO
Year Completed Ongoing
Project Title Overhaul of Sundyne -Marelli (Oily water) pump
Project Description This project involves carrying out inspection of pumps as received, Dis-assembling pumps, performing dimensional/tolerance checks on used/new parts, pre-assembly inspection and overhauling pumps with new parts. Other activities include performing functional/shop test on pumps  after overhaul, carrying out pre-installation checks on pumps and ancillaries on site, coordinating installation of pumps on site, commissioning and test-run of pumps, also post-commission checks on pumps.
Client Frontier Oil Ltd
Year Completed Ongoing
Project Title Supply of maintenance spares for Sundyne-Marelli Oily water pump
Project Description This project involves supply and delivery of new maintenance spares as will be required for the overhaul of Oily water pumps at BOG service center.
Client Frontier Oil Ltd
Year Completed: Ongoing
Project: Training and Supervising of Jointers and Bonders for Egina Project
Project description The project involves provision of Certified Personnel to supervise and train Jointers and Bonders for SHI, to qualify them to bond pipe joint sizes up to 24 inches for 20 Bar on the Egina FPSO Project. Training covers jointing systems, tooling and equipment, handling and storage, cutting calculation, etc, also fabrication of 3 inches’, 8 inches’ and 16 inches’ spools. Other activities include monitoring to ensure adherence to approved procedure on operations.
Client: Samsung Heavy Industries
Year Completed: Ongoing
Project: Provision of Manpower Support Services
Project description Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions
Client: Chevron
Year Completed: Ongoing
Project: GRE Piping System – Maintenance Services At Agbami FPSO
Project description Maintenance of NOV (Ameron) Glass fibre Reinforced Epoxy (GRE/GRP) pipes and fitting for Agbami FPSO.
Client: Chevron/Tamex Technical Services
Year Completed: Ongoing
Project: Supply of SDV (Ball  Valves) for MOBIL OCIP II Project
Project description Supply of SDV (Ball  Valves) for MOBIL OCIP II Project
Client: BENEPROJECTI LIMITED
Year Completed: Ongoing
Project: Supply of Air Reciever
Project description Supply of Tank Air Reciever with saftey relief valves, drain valve, pressure gauge.
Client: NLNG
Year Completed: Ongoing
Project: Fabrication and Installation of GRE pipes on the Chevron-Abiteye Sewage Treatment
Project description Fabrication and Installation of GRE pipes on the Chevron-Abiteye Sewage Treatment
Client: Chevron/Dorman Long
Year Completed: Ongoing
Project: Installation of 20X14 Inches reducer and repair of damaged GRE Spool
Project description Installation of 20X14 Inches reducer and repair of damaged GRE Spool
Client: Chevron
Year Completed: Ongoing
Project: Supply of Spares – Ball Bearings, Washer Locks, Control Valves, Pressure Guages, Cartridge, Dosing Pumps, Valves, Hydraulic Control
Project description Supply of Spares – Ball Bearings, Washer Locks, Control Valves, Pressure Guages, Cartridge, Dosing Pumps, Valves, Hydraulic Control from various Manufacturers
Client: Total
Year Completed: Ongoing
Project: Retroffiting of Ingersoll Rand XE 145M Controllers at Total Ofon Platform
Project description Retroffiting of Ingersoll Rand XE 145M Controllers at Total Ofon Platform
Client: Total
Year Completed: Ongoing
Project: Provision of Maintenance Services of ATLAS COPCO Air Compressors in Seplat Facilities
Project description Provision of Maintenance Services of ATLAS COPCO Air Compressors in Seplat Facilities
Client: SEPLAT
Year Completed: Ongoining
Project: OFON 2 Fabrication and Installation of GRE Spools for OFD1 platform
Project description OFON 2 Fabrication and Installation of GRE Spools for OFD1 platform
Client: PONTICELLI
Year Completed: Ongoing
Project: Supply & Installation of GRE Spoolable Pipes (OBEN Pliot Project)
Project description Supply & Installation of GRE Spoolable Pipes (OBEN Pliot Project)
Client: SEPLAT
Year Completed: February 2019
Project: Troubleshooting of Ingersoll Rand compressor
Project description Troubleshooting of Ingersoll Rand compressor
Client: N2 Energy Ltd
Year Completed January 2019
Project Title Supply of Goodwin Check Valve
Project Description Supply of Goodwin Check Valve
Client Mobil
Year Completed: January 2019
Project Title Supply Of Butch Relief valve
Project description Supply Of Butch Relief valve
Client: Chevron