2018
Year Completed: Ongoing
Project: Supply Of Valves For  EDOP QI Valves And Traps
Project description Supply and Installation of Valves (ball, Globe, Check, Gate), Stud Buts & Nuts, Gasket and Instrumentation offerings for EDOP QI Valves and Traps.
Client: Exxon Mobil / Prime Sources Limited
Year Completed: Ongoing
Project: Exxon Mobil Ubit Restoration Project – Offshore
Project description Fabrication, installation & testing  Of Pressure Vessels – FRP Piping Scope.
Client: Project Masters Nigeria Limited
Year Completed: Ongoing
Project: Supply of 40″ Pibiviesse Valves
Project description Supply of 4 pieces of 40″ class 900 Pibiviesse Actuated Ball  Valves for Shell/NNPC pipeline project.
Client: SPDC
Year Completed: Ongoing
Project: Exxon Mobil Ubit Restoration Project_Fabrication of Pressure Vessels – Onshore
Project description Purchase and Fabrication Of Pressure Vessels – FRP piping materials (GRE & Copper Nickel).
Client: Aveon
Year Completed: Ongoing
Project: Supply Of Milton Roy Pump
Project description Supply of PUMP PN149V22M350 / .9.VV2 PK144R8M350 / VV2
Client: Chevron Nigeria Limited
Year Completed: Ongoing
Project: Supply Of Sundyne Compressor
Project description Supply Of Plug in compressor SN D-C240044-1-a/b/c/d, comprising of gearbox, Mechanical Seal, Diffuser with cover, Process Seal with Seal Housing and Impeller.
Client: Chevron Nigeria Limited
Year Completed: Ongoing
Project: Ingersoll Rand Compressor Services
Project description Configuration & Installation of M145 SGNE controller on IR compressor.
Client: Kimberly Clarke W.A
Year Completed: Ongoing
Project: Maintenance of Ingersoll Rand compressors (5 Units)
Project description The project involves inspection (a pre-service inspection and 16000 hours of maintenance) and repair of safety/service valves with new parts. Other activities include performing functional tests on compressors after service, Pre-installation checks on compressors and ancillaries on site. Following this will be a reinstatement of compressors on site, commissioning and test-run of pumps and post-commissioning checks on the compressors.
Client: Glassforce Nigeria Ltd
Year Completed: Ongoing
Project: Repair of Damaged Pitchar Coating on GRE Spools for the Egina project.
Project description The project involves repair of damaged Pitchar passive fire protection (PFP) Coating on GRE spools in Samsung Heavy Industries facility. Sixteen (16) GRE personnel were mobilized to carry out the repair.
Client: Samsung Heavy Industries
Year Completed Ongoing
Project Title Overhaul of (HPGS.3X1.5X8H.DA8) Sundyne HMD Kontro pump of Amenam platform.
Project Description This project involves inspection of disassembled pumps in BOG workshop, dimensional/tolerance checks on used/new parts, pre-assembly inspection and  overhauling pumps with new parts. Also included is a  functional/shop test on pumps  after overhaul.
Client Total Nigeria
Year Completed Ongoing
Project Title Overhaul of Sundyne -Marelli (Oily water) pump
Project Description This project involves carrying out inspection of pumps as received, Dis-assembling pumps, performing dimensional/tolerance checks on used/new parts, pre-assembly inspection and overhauling pumps with new parts. Other activities include performing functional/shop test on pumps  after overhaul, carrying out pre-installation checks on pumps and ancillaries on site, coordinating installation of pumps on site, commissioning and test-run of pumps, also post-commission checks on pumps.
Client Frontier Oil Ltd
Year Completed Ongoing
Project Title Supply of maintenance spares for Sundyne-Marelli Oily water pump
Project Description This project involves supply and delivery of new maintenance spares as will be required for the overhaul of Oily water pumps at BOG service center.
Client Frontier Oil Ltd
Year Completed: Ongoing
Project: Training and Supervising of Jointers and Bonders for Egina Project
Project description The project involves provision of Certified Personnel to supervise and train Jointers and Bonders for SHI, to qualify them to bond pipe joint sizes up to 24 inches for 20 Bar on the Egina FPSO Project. Training covers jointing systems, tooling and equipment, handling and storage, cutting calculation, etc, also fabrication of 3 inches’, 8 inches’ and 16 inches’ spools. Other activities include monitoring to ensure adherence to approved procedure on operations.
Client: Samsung Heavy Industries
Year Completed: Ongoing
Project: Provision of Manpower Support Services
Project description Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions
Client: Chevron
Year Completed: Ongoing
Project: Supply of OMB Valves
Project description Supply of OMB valves of various sizes including: 28″ BSE600R+,FB, CL600, OMB Ball Valves; BSE600R+, FB, CL600, DN200; BSE600RF-MTL-GO-10″, FB, CL600, OMB Actuated Ball Valves; and 16″ and 28″ OMB Valves.
Client: SPDC
Year Completed: Ongoing
Project: GRE Piping System – Maintenance Services At Agbami FPSO
Project description Maintenance of NOV (Ameron) Glass fibre Reinforced Epoxy (GRE/GRP) pipes and fitting for Agbami FPSO.
Client: Tamex Technical Services/Chevron
Year Completed Ongoing
Project Title Refurbishment & Pre-commissioning of heavy duty Biocide injection pumps at Oml 100 Odudu Field.
Project Description The project involves inspection of strip pumps, performing dimensional/tolerance checks on used/new parts, pre-assembly inspection and overhauling pumps with new parts. Service will also include performing functional/shop test on pumps after overhaul, painting pumps, carrying out pre-installation checks on pumps and ancillaries, coordinating installation of pumps on site, commissioning and test-run of pumps and post-commission checks on pumps.
Client Total Nigeria
Year Completed: 2018
Project: EHRA seawater Line Repair.
Project description Repair of 12” seawater GRE line to ICC
Client: Exxon Mobil
Year Completed: 2018
Project: Provision of MER well testing services at Robertkiri platform.
Project description Provision of MER   Services  with (MPFM) in OML-55 Field.
Client: Belema Oil Producing Ltd
Year Completed: 2018
Project: Commissioning of Ingersoll Rand Nitrogen compressor.
Project description Commissioning of Ingersoll Rand Nitrogen compressor for GE LNG.
Client: GE LNG, Rumuji
Year Completed: 2018
Project: Fabrication of 20’’x14’’ flanged spool for minox 2 line.
Project description Agbami CWE030 20X40’’ Minox 2 line fabrication.
Client: CHEVRON/TAMEX
Year Completed: 2018
Project: Chemical Rehabilitation of Milton Roy dosing skids at SPDC Ogbotobo Flow station.
Project description Installation and Commissioning of three (3) MRE Chemical Injection Skids.
Client: SPDC/FREDBARO
Year Completed 2018
Project Title Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project Description This project entailed performing as received inspection, disassembly and assembly, Dimensional/tolerance checks on used/new parts, pre-assembly inspection, Supply of maintenance spares and overhauling pumps with new parts. Also included was a Hydrotest/Hydraulic test, Functional/shop test after overhaul, Pre-installation checks on pumps and anciliaries, coordination of installation, Alignment checks/measurement, commission, test-run and post-commission checks.
Client NLNG
Year Completed: 2018
Project: Supply of 40″ Pibiviesse Valves
Project description Supply of 2 pieces of 40″ class 900 Pibiviesse Actuated Ball  Valves for Shell/NNPC pipeline project.
Client: SPDC
Year Completed: 2018
Project: Repair of Damaged Pitchar Coating on
GRE Spools on Egina project.
Project description The project involved repair of damaged Pitchar Passive Fire Protection (PFP) Coating on GRE spools in SHI facility.
Client: SHI / NOV