2015
Year Completed: 2015
Project: Supply of Goodwin Check Valves
Project description Supply of Goodwin Check Valves ranging from D:400-Check-Flanged-Dual Plate-WLDD Seat; D:300-Check-Flanged-Dual Plate-WLDD Seat; D:350-Check-Flanged-Dual Plate-WLDD Seat; D:50-Check-Flanged-Dual Plate-WLDD Seat; D:200-Check-Flanged-Dual Plate-WLDD Seat; D:300-Check-Flanged-Dual Plate-WLDD Seat; D:200-Check-Flanged-Dual Plate-WLDD Seat
Client: Saipem
Year Completed: 2015
Project: Supply of OCTG (Tubings and Casings)
Project description Supply of 3-1/2″, 9.2/9.3 ppf 13% CR, L80 (L13), CSH,/VAM TOP and 3-1/2″, 9.2/9.3 ppf N80, CSH,/VAM TOP
Client: Seplat
Year Completed: 2015
Project: Supply and Installation of GRE pipes
Project description Manufacture, Supply and Installation of 6.2″ GRE 1750PSIA Spoolable pipe from Amukpe LTF to Sapele Well 4 (Water Disposal Project) with excavation, back filling, fabrication of hook up spools and installation of fiber spar spools.
Client: Seplat
Year Completed: 2015
Project: Supply and Installation of GRE Spoolable pipes.
Project description Supply of GRE Spoolable Pipes for OBEN High Pressure 4” nominal 3000 series Fiberspar Linepipe-J with HDPE Pressure Barrier & HDPE External Wear Layer Water Injection Pipeline from the Water Treatment/Injection Package Outlet Header to the Injection Well (OBEN 21) for the OBEN Pilot Water Treatment and Injection Package Project.
Client: Seplat Petroleum Development Company PLC
Year Completed: 2015
Project: Blasting and Painting of Platforms in OML 123
Project description Blasting and Painting of three platforms in OML 123; BOGI, EBE, and ADS1 & ADS2. Scope of work include but not limited to; provide & install work aids such as scaffolding, ropes and riggings required to access work area
Client: Addax
Year Completed: 2015
Project: GRE Spool Fabrication for Chevron Domestic Supply Obligation (DSO) Offshore
Project description Supply and Fabrication of GRE Spool (Pipes and Fittings) for Gas Gathering and Compression Plattform Bridge (GGCP) and Non associated Gas Wellhead Projects & LQP (NWP) scopes for DSO Project. Ranging from 2″, 3″, 4″, 6″, 8″, 10″ and 12″.
Client: Hyundai Heavy Industries
Year Completed: 2015
Project: Provision of Manpower Support Services
Project description Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions
Client: Chevron
Year Completed: 2015
Project: Supply of Ingersoll Rand Rotarty Air Compressor
Project description Supply of 1 Ingersoll Rand Rotarty Air Compressor HH150A-SD (Air cooled after cooler, 1150F maximum ambient, online/offline control, star delta starter, full enclosure, auto start/stop control, remote start/stop control, NEMA 4 electrics, high dust filtration, 565 CFM capacity, 150 PSIG, high efficiency motor)
Client: ExxonMobil
Year Completed: 2015
Project: Fabrication & Supply of Deep Offshore Carbon Steel Bare Seamless Line Pipes For Total Egina Project
Project description Fabrication & Supply of 33,200m Production seamless line pipes 14″ ND (X65, sour service severity 1), (OD 355.6mm, WT 27.0mm), 23,100m Gas Export seamless line pipes 14″ (X65, sour service severity 3), (OD 355.6 WT 19.1mm) and 26,800 seamless line pipes 12″ ND (X65, sweet service severity 0), (OD 323.9mm, WT 22.2mm); with special testing program for reeling installation: with long term preservation for Egina project. Total Tonnage of pipes is approximately 15,359MT
Client: Total
Year Completed: 2015
Project: Supply Of Portable Methanol Injection Skid For OFD3 & OFD5 Ofon Project
Project description Supply and inspection of 2 Portable Methanol Injection skid with double diaphragm pumps with local detector for OFD3 & OFD5, lifting beam with slings and saddles,
Client: Nigerdock/Total
Year Completed: 2015
Project: Supply of OMB Valve
Project description Design and Supply of OMB Ball Valve BSE600R+ FB, CL60, DN700
Client: SPDC
Year Completed: 2015
Project: Supply of Goodwin Valves
Project description Supply of 8-12″, ZBF, ANSI 1500 FS99R2YIS Nozzle Check Valve and BBR 12-015-XSUUR/YS valve; Plates: CFSM O/Lay ST6 – Spring x750
Client: Saipem
Year Completed: 2015
Project: Supply of Goodwin Valves
Project description Supply of BFR30CSSP R/YS, 30″ Stainless Steel Check Valves
Client: SPDC
Year Completed: 2015
Project: Supply of Goodwin Valves
Project description Supply of Various Check Valves 20″ 2500LB, ITCS BODY 316 SS Dual Plate, API 594 TRIM #12, Compact Flange RTJ Class FCA21 HG-05824636 -FCA21 -PP1N SPEC:FCA21 Service – HG TAG: V-1117 & TAG#=V-1073, Type=CD405, CLASS=FCA21, Paint Code=12.1, End Type Compact Flange
Client: Chevron
Year Completed: 2015
Project: Fabrication & Installation of GRE Spools
Project description Provision of Fabrication & Installation of GRE Spools; Pipes and Fittings, at OFON2 OFP1 & OFD1 plattform
Client: Ponticelli/Total
Year Completed: 2015
Project: Supply of 4-Way Diverter Valve
Project description Supply of 1 Cameron Hydraulic Power Unit 50Hz & 1 Cameron Valve Diverter (Model 4w-110A, Manufacturer Part Number B4721, 16in, Hydraulic, Flanged)
Client: Shell
Year Completed: 2015
Project: Supply of Tobylink Valves for MTO 8050-Okan GGCP Gas Lift Phase 2 Works
Project description Supply of 2 RTJ Pressure Control Valves (3″, 900lb) & 1 RTJ Control Valve (6″, 900lb)
Client: Chevron
Year Completed: 2015
Project: Procurement of Line Pipe and Bends for OML 123 and OML 124
Project description Procurement and delivery of Linepipe ranging from 6″ to 12″ Carbon Steel , OD 168.3 – 323.9, API 5L Gr. X52 PSL2, 7.1 – 11.1 mm Wall Thickness, Seamless, Bare Pipe
Client: Addax
Year Completed: 2015
Project: Supply of ESI Valves
Project description Design and Supply of Pressure relief valve, 6X6″, ZEECO
Client: Shell
Year Completed: 2015
Project: Supply of Seamless Tubing
Project description Supply of 9,500 joints of 3-1/2 L80 9.3 EUE Seamless Tubing, R-2 Bevelled Couplings According to API 5CT Standard.
Client: Addax
Year Completed: 2015
Project: Supply of Dual Plate Check Valves
Project description Design and Supply of Goodwin Dual Plate Check Valves for the Shell Gbaran Ubie Project Package 1
Client: Daewoo Nigeria Limited
Year Completed: 2015
Project: Supply of Fittings
Project description Design and supply of Parker autoclave fittings, ranging from 1″ X 6″ Long coned and threaded nipples SS316L to IPDE: Tooling Kit 1/4 X 7/64, EW MACH.
Client: Shell
Year Completed: 2015
Project: Supply of Ingersoll Rand Parts
Project Description Frame agreement for supply of Ingersoll Rand spare parts (East and West: NG01010099 & NG01010100)
Client: Shell