2014
Year Completed: 2014
Project: Provision of Manpower Support Services
Project description Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions
Client: Chevron
Year Completed: 2014
Project: Design, Manufacture and Supply Of Chemical Injection Package For OFD3 & OFD5 Ofon Project
Project description Design, Manufacture and Supply and installation of 2 Chemical injection skid with double diaphragm pumps for OFD3 & OFD5, Automated stroke adjustment with ECC actuators (exproof) signal 4-20m.
Client: Nigerdock/Total
Year Completed: 2014
Project: Supply Of Portable Methanol Injection Skid For OFD3 & OFD5 Ofon Project
Project description Supply and inspection of 2 Portable Methanol Injection skid with double diaphragm pumps with local detector for OFD3 & OFD5, lifting beam with slings and saddles,
Client: Nigerdock/Total
Year Completed: 2014
Project: ERHA North Phase 2 Project
Project description Supply of Seamless Cladded and non Cladded Line Pipes, ranging from 6″ to 12″ of about 5,149 MT in weight
Client: Subsea 7
Year Completed: 2014
Project: Supply Of Casing
Project description Supply of 5715 Pieces of Joint Casing at 40ft/joint, 9-5/8″, 47Lb/Ft, BTC, R3 of approx. 4,840MT
Client: Addax
Year Completed: 2014
Project: Supply of 36,000 FT Casing
Project description Three phase Supply of Casing, 9-5/8″, 47PPF, 13CrL80, JFE Bear Pin x Box Connections of 780MT
Client: Afren
Year Completed: 2014
Project: Provision of Welltesting Services
Project description Provision of Multiphase flow meter well testing services for Ovhor Well
Client: Seplat Petroleum
Year Completed: 2014
Project: Supply of Gate Valves as requested by Terminal Operations
Project description Supply of 2 M&J RQ-8 Slab Gate Valves 30″ and 2 M&J RQ-8 Slab Gate Valves 36″
Client: Chevron
Year Completed: 2014
Project: Engineering, Procurement, Construction and Commissioning for GRP & PVDF Piping for OFD3 & OFD5 Platforms and Access Bridges
Project description Provision of Elbows (45/90 TF) ranging in size from 2″ to 6″, Coupling, Tees, Flanges, Pipes (by MT TMXTF 3.6mm 3.9mm and 4.6mm, 306 Meters) ranging in size from 2″ to 6″
Client: Nigerdock
Year Completed: 2014
Project: Supply of Deliverables for Mobil Offshore Security Upgrades Project
Project description Supply of Software; Provision of Operation, Installation and Maintenance Procedures; Pre-Commissioning Procedures; Commissioning Start-up, Turnover and Completion Procedures; and Preparation of Training Operation and Maintenance Manuals.
Client: Delta Afrik
Year Completed: 2014
Project: Provision of Seismic Supervision Services
Project description Provision of Seismic Supervision Services (Contractor Junior H3SE Trainee Supervisor) for USAN 4D Monitor 2 Survey (OML 138)
Client: Total
Year Completed: 2014
Project: Supply of Materials for Minox Pressure Control Valve Change Out Project on Agbami FPSO
Project description Supply of 30 materials including 12″, 14″ and 20″ pipes, ball valves and full face gaskets for Minox Pressure Control Valve Change Out Project on Agbami FPSO
Client: Chevron
Year Completed: 2014
Project: Supply of Milton Roy Parts & Spare Part
Project Description Frame agreement for supply of Milton Roy products & spare parts (NG01010147)
Client: Shell
Year Completed: 2014
Project: Design, Manufacture and Supply Of Meren Water Injection Platform (MWIP) ElectroChlorinated Package
Project description Design, Manufacture and Supply of skid-mounted PEPCON ChlorMaster 2 x CM-S-2(BP) Sodium Hypochlorite Generation System package. The package consist of 2 x 100% Hypochlorite Generators, each with a generating capacity of up to 16 lb/hr chlorine equivalent as NaOCl. ElectroChlorinated Package
Client: Chevron
Year Completed: 2014
Project: GRE Pipe System Maintenance Services
Project description Fabrication, Installation and Maintenance of NOV GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Agbami FPSO
Client: Chevron
Year Completed: 2014
Project: Fabrication and Installation of FRP, HDPE & CPVC Pipeline at Escravos
Project description Excavation, Painting, Cutting, Shaping, Joining, Clamping, Padding and Laying of the following lines: 3″ SE-A50-6007, 4″ SE-A19-6007, 6″ WP-A50-6112, 12″ W-B50-6129 and Hydro-testing.
Client: Idmon Engineering & Contruction
Year Completed: 2014
Project: Supply of Calcium Hypo chloride Milton Roy Pump & Ferric Sulfate Milton Roy Pump
Project description Supply of Milton Roy Calcium hypo chloride & Ferric Sulfate Dosing Pump, Check Valve Assembly, Diaphragm D105, Kit type *C* plastic D105,
Client: Chevron
Year Completed: 2014
Project: Supply of Tubing
Project description 4 Tubes Ranging in Meters/Pcs from 12 – 20160, Length: R2, Connections: RTS-8 Pin & KSBEAR, Lb/Ft: 6.50 – 12.95, Grade: P-110 & 13CR-110
Client: Agip
Year Completed: 2014
Project: Supply of Atlas Copco Compressor Spares For Akpo Project
Project description Supply of maitenance overhaul kit for operation including: 2 O Ring Check valve, HP & LP balance piston diaphragm, Drive coupling rubber set, Muffler, Check valve kit, bearing, sleeve, inlet valve overhaul kit for Atlas Copco Compressor maitenance.
Client: Total
Year Completed: On going
Project: Supply of OMB Carbon Steel Ball Valves
Project description: Supply of 2″ (50),  2″ (50),  3/4″ (20),  2″ (50),  1″ (25) & 3/4″ (20) Ball Valve Flanged Ends Long Pattern and 4″ (100), 6″(150), 3″ (80),  2″ (50),  12″ (300),  4″ (100) & 6″ (150) Ball Valve Flanged Ends Standard Pattern.
Client: Saipem
Year Completed: 2014
Project: Provision of Well Testing Services for Orogho and Okporhuru Wells
Project description Provision of Multiphase Flow Meter Well Testing Services for Orogho and Okporhuru Wells
Client: Seplat Petroleum
Year Completed: 2014
Project: Repair of GRE Lines
Project description Repair of 2″, 4″, 10″ & 3″ GRE Line on Total Akpo
Client: Total
Year Completed: 2014
Project: Design, Manufacture and Supply of Atlas Copco Instrument Air System Package
Project description Design, Manufacture and Supply of Atlas Copco Air Compressor Unit 86 K 0701 1A & 1B Electrical Motor Driven (Screw type) and Components, Air Dryer Unit 86 VZ 0701 1A/B & 2A/B Heatless type and Components including On-skid Piping, Valves, Instrumentation, Electrical Accessories and structural, skid frame.
Client: Saipem
Year Completed: 2014
Project: Design, Manufacture and Supply of maintenance overhaul kit and complete high pressure service stage
Project description Design, Manufacture and Supply of 3 maintenance overhaul kits for 16,000 hours operation (for Atlas COPCO ZR425X-10.5 Air Compressor), and 2 Complete of high pressure service stages with epoxy coated screws (for Atlas COPCO ZR425X-10.5 Air Compressor)
Client: Total
Year Completed: 2014
Project: Supply of Milton Roy Complete Pumps
Project description Supply of 1 Milton Roy complete pump with motor (model: POMPED4610M120) and 1 Milton Roy complete pump with motor (model: POMPEMD46G10M54)
Client: Indorama
Year Completed: 2014
Project: Repair and Return of Sundyne Pump
Project description Repair and Return of Sundyne Pump (model: LMV 311Z), 43 Components being repaired, include: oil filter, washers, seal mating ring, nuts, keys, o-rings, shaft sleeves and ball bearings.
Client: Chevron