Year Completed: 2013
Project: Provision of Manpower Support Services
Project description Provision of National and Expatriate technical services, at highly skilled, semi-skilled and skilled levels of workmanship; for Facilities and Engineering, Operations, Drilling and Completions, Health Environment and Safety, Business Services, Administrative, and Skilled Craft positions
Client: Chevron
Year Completed: 2013
Project: Provision of Multiphase Flow Meter Well Testing Services
Project description Provision of Multiphase Flow Meter Well Testing Services in Ovhor Field; Swamp Location
Client: Seplat Petroleum
Year Completed: 2013
Project: Provision of Multiphase Flow Meter Well Testing in Okporhuru Field
Project description Provision of Multiphase Flow Meter Well Testing in Okporhuru Field
Client: Seplat Petroleum
Year Completed: 2013
Project: Provision Of MPFM Well Testing On Okpoho Platform
Project description Provision of equipments and personnel for both Swamp Operation for MPFM Well Testing on Okpoho Platform.
Client: NPDC/Halliburton
Year Completed: 2013
Project: Supply and Installation of Sunstrand Gear Box Assembly
Project description Supply and Installation of 1 Sunstrand Gear box assembly (model: LMV-331), input/output RPM 2960/15232, pump S/N: D-99118144/45
Client: NLNG
Year Completed: 2013
Project: Repair of GRE Lines
Project description Repair of 3″ GRE Line on Total Akpo FPSO
Client: Total
Year Completed: 2013
Project: Chemical Injection Skid Rental
Project description Temporary installation of two chlorination (chemical Injections skid) units
Client: Total (ODP/OFON)
Year Completed: 2013
Project: Repair of GRE Lines
Project description AMD2 Repair of 3″ GRE Line on Total Amenam
Client: Total
Year Completed: 2013
Project: Fabrication & Installation Of GRE Piping On Delta South Quarters (DSQ)
Project description Provision of Personnel and Tools for the Fabrication & Installation of GRE Piping on Delta South Quarters
Client: Aveon / Chevron
Year Completed: 2013
Project: Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project Description General maintenance of the pumps which include activities like striping of the pumps, inspecting the parts to identify the bad spares and non reusable spares such as O’ Rings, rings etc, for replacement.
Client: NLNG
Year Completed: 2013
Project: Design, Manufacture and Supply of Atlas COPCO Complete Pressure Safety Valve and Complete low pressure service stage
Project description Design, Manufacture and Supply of 2 Atlas COPCO Complete Pressure Safety Valves (1″1/2 Gas, 3.7 Bar) and 2 Complete of low pressure service stages with epoxy coated screws for Atlas COPCO ZR425X-10.5 50Hz Air Compressor
Client: Total
Year Completed: 2013
Project: Supply and installation of Atlas Copco Safety Valve For Akpo Project
Project description Supply of 2 complete Pressure Safety Valve of 1″ 1/2 gas, 3.7 bar brass and 2 complete low pressure service stage with Epoxy coated screw for Atlas Copco 5OHZ Air Compressor
Client: Total
Year Completed: 2013
Project: Design, Manufacture and Supply Of Fuel Gas Package
Project description Design, Manufacture and Supply of Fuel gas knock out drum, Fuel gas heater and Fuel gas filter of 1 X 100% configuration, 1.5 mmscfs, 3.5 weight
Client: Seplat Petroleum
Year Completed: 2013
Project: Supply Of Casing
Project description Supply of 1250 joints of 13-3/8″ N80, BTC R3 CASING with non bevelled couplings Casings
Client: Addax
Year Completed: 2013
Project: Supply Of OMB Ball Valve
Project description Supply of 10 Full Bore Forged Steel Cl 600 Raised Face OMB Ball Valve BSE600RF-MTL-GO-20″,FB AND Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2) OMB valves for Shell Valve replacement Project.
Client: Shell
Year Completed: 2013
Project: Repair of 12″ & 4″ GRE Firewater line
Project description: Fabrication, Installation and Maintenance of NOV GRE 12″ X 4″ pipes and fittings and lower diameters GRP lines on Firewater network on WRPC platform
Client: WRPC
Year Completed: 2013
Project: Repair of 8”, 12” and CWC Overboard GRE Pipes
Project description Repair, Fabrication and Installation of 8”, 12” and 14″ CWC Overboard GRE pipes on Agbami FPSO
Client: Chevron
Year Completed: 2013
Project: Operation & Maintenance Of NACJ – Marine Unloading Arm Package
Project Description Operation & Maintenance of Loading Arms: 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty; Stocking of spares for Maintenance Services.
Client: Julius Berger Nigeria Ltd
Year Completed: 2013
Project: Provision Of MultiPhase Well Testing For Land & Swamp Operations
Project description Provision of personnel and Equipments for MultiPhase Well Testing For Land & Swamp wells in Oben, Sapele Field (OML 4, 38 & 41)
Client: Seplat
Year Completed: 2013
Project: Removal, Overhaul, Repair & Installation of Jetty 1 FMC Loading Arm & Facilities
Project description Removal, overhaul, and reinstatement of Marine loading Arms for LNG and Condensate, replacement and upgrade of the electrical control systems, replacement of the hydraulic control systems and like for like parts as per recommendation of OEM.
Client: NLNG
Year Completed: 2013
Project: Supply Of Casing
Project description Supply of 1500 joints of 13-3/8″ N80, BTC R3 CASING with bevelled couplings Casings AND Supply Of Casing: 36X1.5 WT X-52/6XL-5 R3 Conductor Pipe XLC-S Connection or Frank DDC Connection
Client: Addax
Year Completed: 2013
Project: Supply Of Tubing
Project description Supply of 2 – 7/8″ 6.5 – P-110 RTS-8, X-over 3 – 1/2″ 9.3 – P-110 RTS-8, and 6 – 1/2″ 12.7 13CR-110 KSBEAR Tubings to NAOC Port Harcourt
Client: Agip
Year Completed: 2013
Project: Supply Of Milton Roy Chemical Injection Skid
Project description Rental of Milton Roy Chemical Injection skid & Electronic metering pump with storage tank for Total ODP/OFON Odudu Project
Client: Total
Year Completed: 2013
Project: BRT Laoding Arms Repairs
Project Description BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms
Client: ExxonMobil
Year Completed: 2013
Project: Provision Air Winches Rental
Project description Provision of 1 unit of 825 cfm Ingersoll Rand compressor with skid, 2 units of 10 ton air winch with 300 meter 22mm sling, 30/40 meters 1# air hose
Client: Saipem
Year Completed: 2013
Project: Supply of Non-Stabilized PTZ Cameras
Project Description Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras
Client: Delta Afrik
Year Completed: 2013
Project: Supply Of Milton Roy Chemical Injection Duplex Pump
Project description Supply, Installation and Commission of 3 Stainless Steel Chemical Injection Duplex Pump 100
Client: Total
Year Completed: 2013
Project: Supply of Sundyne Compressor LMC 333 & Spare Parts on Agbami FPSO
Project description Supply of Sundyne Diffuser, Nut Impeller, Impeller Spacer, Thruttle Bushing & Lip double Seal & Reverse Pressure Seal for Minox Comprssor C-417700 C-417800 C-418700 C418800 Sundyne Compressor LMC 333 on Agbami FPSO
Client: Chevron
Year Completed: 2013
Project: Supply of Seamless Carbon Steel Pipe
Project description Supply of 60 joints of 2″-Sch Pipe Seamless , 24 3″-Sch Seamless Pipe, 184 4″-Sch Seamless Pipe, 36 2″ – Sch Fine Grain.Cs Seamless Pipe, 24 3″ – Sch Fine Grain.Cs Seamless Pipe, 36 6″ Sch Cs Seamless Pipe
Client: Saipem
Year Completed: 2013
Project: GRE Piping Repair Of Fire Water System
Project description: Fabrication, Installation and Maintenance of NOV GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Usan FPSO
Client: Total
Year Completed: 2013
Project: Provision Of Surface Well Testing Service On
Project description Provision of complete surface test equipment consisting of choke/test manifolds, vessels, valves, flow lines, burners, pumps, pressure, temperature and flow rate measurement, lab facilities and Provision of service technicians for running, servicing, testing etc, field reports, preliminary gauge data analysis and any other service required to ensure an efficient operation
Client: Sterling Energy & Exploration Production Limited
Year Completed: 2013
Project: Repair of 12″ & 4″ GRE Firewater line
Project description: Fabrication, Installation and Maintenance of NOV GRE 12″ X 4″ pipes and fittings and lower diameters GRP lines on Firewater network on WRPC platform
Client: WRPC
Year Completed: 2013
Project: Supply, Installation and Commissioning of Milton Roy Dulex Pump
Project description Supply of 1.5kw Chemical injection pump, 3 0.55kw Duplex chemical injection pump, 2 0.37kw Duplex chemical injection pump of 1500RPM, 50Hz, 240 – 420V with electrical motor (Milton Roy)
Client: Total
Year Completed: 2013
Project: Supply, Installation and Commissioning Of Plant Air Package
Project description Supply, Installation and Commissioning of plant air knock out drum, plant air heater and plant air filter of 1 X 100% configuration, 1.5 mmscfs, 3.5 weight
Client: Seplat Petroleum
Year Completed: 2013
Project: Repair of GRE Pipework on AKPO FPSO (3rd Scope)
Project description Replacement/Correction Of Faulty Parts & Maintenance Of The Akpo FPSO
Client: Total
Year Completed: 2013
Project: Repair Of 12″ Ballast Line On Warrior Vessel
Project description Fabrication, Installation and Repair of NOV 12″ Ballat lower diameters lines Warrior FPSO
Client: Warrior Nassau
Year Completed: 2013
Project: Supply Of Casing
Project description Supply of 12,000 ft of 13 – 3/8″, K55, 68 LB/FT BTC Casings (Seplat Ogunu Warehouse).
Client: Seplat Petroleum
Year Completed: 2013
Project: Provision Of MultiPhase Well Testing For Land & Swamp Operations
Project description Provision of personnel and Equipments for MultiPhase Well Testing campaign in Land & Swamp wells.
Client: Agip
Year Completed: 2013
Project: Repair of Milton Roy Duplex pump on Cawthorne Channel
Project Description Complete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump
Client: Total