2011
Year Completed: 2011
Project: Rental of Injection Skid & Metering Pump
Job Description Rental of Milton Roy Chemical Injection skid & Electronic metering pump with storage tank Total Odudu Project
Client: Total
Year Completed: 2011
Project: Supply of Data Fussion
Project Description Supply of Data Fusion & Art Integration for offshore Security Upgrade Projects.
Client: Delta Afrik Engineering Ltd.
Year Completed: 2011
Project: Inspection of IR compressor
Job Description Repair and overhaul of XP 750 IngersollRand Compressor, including servicing of fuel injector of the compressor
Client: Japan International Company Agency (JICA)
Year Completed: 2011
Project: Fabrication and Installation of GRE piping
Job Description Fabrication and Installation of GRE piping for FSO Unity Oily Water Treatment
Client: Ascot Africa Ltd
Year Completed: 2011
Project: Supply of FMC Smith Meter
Project Description Supply of FMC Smith Meter Model: LE3-S3(Standard Trim), Smith Meter Model: LE3-S3(Standard Trim) Master Meter, Accuracy Curve (5 point Flow Test) for Master Meter. (on standard factory test fluid) and Smith Meter In-line Strainers.
Client: ExproTech
Year Completed: 2011
Project: UT, Blasting and Painting of Trinity FPSO
Job Description Scaffolding, blasting, and painting of all structures, vessels (seperators), piping and manifold on top of the production deck, Cellar deck, skimmer dect and painting at thye boat landing area on Trinity FPSO.
Client: Shebah Exploration & Production Company Ltd
Year Completed: 2011
Project: Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project Description General maintenance of the pumps which include activities like striping of the pumps, inspecting the parts to identify the bad spares and non reusable spares such as O’ Rings, rings etc, for replacement. General cleaning and servicing of the Sundyne pump (1-P-2511A, 2-P-1580B & 3-P-1580B)
Client: NLNG
Year Completed: 2011
Project: Engineering Requisition for Asset Tracking Systems UHF Receiver &Transponders
Project Description: Supply of 4 Uhf Asset Tracking System Seetrac Base Unit (Sbu-Mil/G/S) Tt108/S/K, Including High Gain Antenna (Ttag05), Installation Kit Sbu-Ik 3 And 25uhf Asset Tracking System Seetrac Tender Unit (Stu) Tt101/K Including Ttag05 High Gain Antenna, Tts06 Panic Rocker Switch And Installation Kit Stu-Ik 1.
Client: Delta Afrik Engineering Ltd.
Year Completed: 2011
Project: Supply of Valve (Breda)
Project Description Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type.
Client: Agip
Year Completed: 2011
Project: Supply of Milton Roy Chemical Injection package
Project Description Chemical Dossing package including factory test & Special tool (Changing Kit for Damper) Engineer, manufacture and assemble in accordance with Company’s project specification.
Client: Chevron
Year Completed: 2011
Project: 5 Year Preventive and Corrective Maintenance of Loading Arms at NLNG Jetty.
Project Description Removal,  Overhaul, Repair and Reinstallation of Jetty 1 FMC Loading arms and facilities for NLNG on Bonny Island.
Client: NLNG
Year Completed: 2011
Project: Repair of Milton Roy Duplex pump on Cawthorne Channel
Project Description Complete overhaul of the Duplex pump, including striping of the pump, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the Duplex pump
Client: Shell
Year Completed: 2011
Project: Installation of GRE Earthing Saddles on GN Platform
Job Description Onshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP)
Client: Subsea7 / Globestar
Year Completed: 2011
Project: Repair of GRE Fire water network
Job Description Fabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement
Client: Total
Year Completed: 2011
Project: Repair of Rapture 2″ x 16″ Saddle Reducer & 6″ FRP Flange
Job Description Repair, Cutting, bonding laminating curing, and installation of 2″ X 6″ FRP flange for sand filter Backwash system, Adjustment of a 4″ FRP spool to accommodate a spacer ring and fixing of  2, 30″ FRP Saddle Reducer 6″ FRP Flange on Akpo FPSO
Client: Total
Year Completed: 2011
Project: Supply of Casing
Job Description Supply of size 9-5/8″, 7″ 4-1/2″ van top Casing
Client: Seplat
Year Completed: 2011
Project: Supply of Sundyne Gear Box
Job Description Supply of new gear box, 311 Gear Box – 311, S/N 97117228/29 Sundyne Gear Box
Client: NLNG
Year Completed: 2011
Project: GRE Repairs GRE Repairs on Ebok MOPU Injection Line
Job Description GRE Repairs on Ebok Mobil Offshore Production Unit Injection Line
Client: Ivorene / Afren
Year Completed: 2011
Project: OML-99 GRE Reapir works on Amenam
Project Description Repair of cracked 16″ GRE Fire water pump B at AMP2, Reinfocement of 2 Nos10″Fire hydratant line at AMP 2, Replacement of 2″X28″ GRE Red sad for cooling system at AMP2, Fabrication of 4″ GRE flanged Spool, and fabrication of a 4″ GRE vent Droplet down to the grating.
Client: Total
Year Completed: 2011
Project: EAP GN 4th Compressor – Installation of Fiberglass piping on GN Platform
Project description Onshore fabrication and offshore installation, Testing/Commissioning of 2″ 3″ and 4″ fiberglass piping on Mobil GN platform (Additional work on ECIP)
Client: Subsea 7 / Globestar
Year Completed: 2011
Project: Repair of MULA Arms 1, 2 and 4 of NACJ
Job Description Scaffolding, Weld-repair of defect on MULA 1, Addition of 8 brackets (stiffeners) on MULA 2 and 4 as a preventive action, Carry out Non-Destructive Test (NDT) on weldments, Blast-cleaning of effected areas and coating with anti-corrosion paint.
Client: Julius Berger Nigeria Ltd
Year Completed: 2011
Project: Repairs on GRE 4″ Hydrant Crank
Job Description Repair and maintenance work on pump A, GRE 4″ Hydrant crack
Client: Total Akpo
Year Completed: 2011
Project: Repair of 2Nos Starter Motors
Job Description Dismantling of the Starter Motor, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the the 2Nos Starter Motors.
Client: Japaul
Year Completed: 2011
Project: Repair of SP375 Ingersoll Rand Compressor
Job Description Repair of SP375 Ingersoll Rand Compressor, dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor.
Client: Nestoil Group
Year Completed: 2011
Project: Supply of OCTG
Job Description Supply of 36″ API SL, X-56, PSL-2 Conductor pipe (OCTG)
Client: Addax Petroleum
Year Completed: 2011
Project: GRE repairs on Akpo FPSO
Job Description Fabrication, Installation, Repair, and Testing of 6″ & 3″ GRE firewater line for Akpo FPSO
Client: Total
Year Completed: 2011
Project: GRE Pipe System Maintenance Services
Job Description Fabrication, Installation and Maintenance of Ameron GRE/GRP 20″ X 16″, 12″ X 10″ pipes and fittings and lower diameters GRP lines on Firewater network on Agbami FPSO
Client: Chevron
Year Completed: 2011
Project: Repair of Firewater Pump
Job Description Repair, Installation and testing of leaking AMP2 Firewater Pump A&B 8in discharge line at OML – 99 Amenam FPSO
Client: Total
Year Completed: 2011
Project: Supply of Ingersoll Rand Cylinder
Job Description Supply of 94 Gasket Valve Seat, 76 Capscrew 28, 56 Valve Check, 48 Cotter Pin 5, 44 Ring,Oli Scapper 9, 43 Retainer Valve 9, 33 Gasket Valve Seat 9, 34 Valve Retainer and 27 Pump Assembly Lubricating Oil Bushing, Ingersoll Rand Compressor Cylinder Spares
Client: Shell
Year Completed: 2011
Project: Supply of FMC Loading Arms
Project Description Supply of Loading arms spares which includes Valve Pressure relief, Seal 125-108 20/40, MOCBague De Packing 16″ Secon Cryo, Valve Solenoid, 2POS, Eex “D”, etc. This was used for the Overhaul Spares for the 3 NLNG Marine Loading Arms
Client: NLNG
Year Completed: 2011
Project: Specialist Services on Dynamic Fiscalization System in SPDC Forcados Terminal
Project Description Specialist services of 24″-ASTM API-5L X60, SCH 60,PSL2 pipes on Dynamic Fiscalization System in SPDC Forcados Terminal.
Client: Shell
Year Completed: 2011
Project: Supply of FMC Kits
Job Description Supply of FMC PMS for 7 Arms, Stainless Steel Ice Net FOR 4 LNG MLA, Kit of hydraulic & electric for 2 condensate loading arms, 1 set 25T a frame for backward 25 T H 2250mm, 2 frames forward 25 T H 1900mm with HEM etc. For Upgrade of Electrical control system on Jetty 1 DRC 8734.
Client: NLNG
Year Completed: 2011
Project: Supply of Shim Crosshead Shoe
Project Description Supply of 5 Random Length of 36 to 40 feet and manufactured to ASME B36.10
Client: Shell
Year Completed: 2011
Project: Supply of Ingersoll Rand Con Rod Kit
Project Description Supply of Ingersoll Rand 30 10T Safety Valve, 60 Assy Valve, 70 Con Rod Kit, 80 30-15T Seal Oil, 90 Level Switches, 110 Brg/Conn Rod Kit, 120 Thrust Pin, Crankcase, Centrifugal Unloaded & Pilot Valvea
Client: Shell
Year Completed: 2011
Project: Procument of Dosing Pump and Flowmeter
Job Description Procument, Installation and Commissioning of Dosing Pump and Flowmeter on Hypochlorite line at Erha
Client: Exxonmobil
Year Completed: 2011
Project: Supply of Flanges
Job Description Supply of 7 24″ flange, 10 20″ flange, 12 20″flange, 16″flange, 2 12″ flange,1 10″ flange, 30 2″ flange, 9 2″ flange, 3  16″ x 20″ eccentric reducer same thickness as pipe, rectangular bar ,1’ x 1/4″,astm a36(18 to 20 ft), 1 plate 3/8″astm a36 (5ft x 20ft), wide flange beam w16 x 40 astm a36 20ft, 28″ flange wn 900# rtj, 24″ flange wn 900# rtj, etc
Client: Exxonmobil
Year Completed: 2011
Project: Supply of Line Pipes
Project Description Supply Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M,
24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M. services
Client: ExxonMobil
Year Completed: 2011
Project: Grit blasting and painting of Ebugu platform
Project Description Grit blasting and painting of all pipe work and associated support of the topsides and jackets of Ebugu platform OML 123
Client: Addax Petroleum
Year Completed: 2011
Project: GRE Repair on OML58
Job Description Fabrication, Installation, Repair and Testing of 6″ GRE line on OML58 at Obite
Client: Total
Year Completed: 2011
Project: Provision of Specialist Support Sevices for SPDC Metering Department
Project Description Provision of Specialist Support Sevices which includes mob and demob, specialist support, periodic maintenance checks, and reporting for SPDC Metering Department.
Client: Shell
Year Completed: 2011
Project: Fabrication, Installation and Repair of Raptureed 12″ & 20″ GRFP Fire Water Line
Job Description Fabrication of spool and fittings, cutting of 20″ line damaged section, Bonding of 2, 20″ elbow and flange by fit and reinforced laminations and Mechanical coupling of flanged ends of 20″ carbon steel and 20″ GRFP Fire Water Line
Client: WRPC
Year Completed: 2011
Project: Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp wells
Job Description Multiphase Well Testing of: EBEGORO2T,ALS2T, OBF35LS, OBF36T, OBF37LS, OSHIE8SS, OLEH1LS
Client: Agip
Year Completed: 2011
Project: Provision of Multi-phase flowmeter for ETISONG NORTH 1
Job Description Provision of Multi-phase flowmeter for ETISONG NORTH 1 Exploratory well test campaign
Client: Total / ExproTech
Year Completed: 2011
Project: Supply of Pipe and Tubings
Project Description 18″-API 5L X65 Seamless BE, SCH. 60 Carbon Steel pipes, 12″-ASTM A 333/A 333M B Gr 6 Seamless BE, SCH 120 Carbon Stee pipes, 8″-ASTM A 333/A 3, 4″ and 18″ x 12″ Red Bar Tee SCH. 60 Butt Weld, ASTM A860, GR. WPHY 65 SMLS same thickness as pipe services hydrocarbon.
Client: ExxonMobil
Year Completed: 2011
Project: GRE repairs on Akpo FPSO
Job Description Repair of 6″, 8″ & 16″ GRE line & Sand filter on Akpo FPSO
Client: Total
Year Completed: 2011
Project: GRE repairs on Erha FPSO
Job Description Repair of 20″ and 40″ GRE line on Fire Water Network Erha FPSO
Client: ExxonMobil
Year Completed: 2011
Project: GRE repairs on Firewater networks
Job Description Fabrication, Installation and Repair of 20″ GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20″ carbon steel and 20′ GRFP line to bellow. Commission and testing of newly installed 20″ GRFP fire water line and casting of proper placement of Neoprene to avoid crack during line movement
Client: WRPC
Year Completed: 2011
Project: Damaged GRE Fire Water Line Repairs
Job Description Fabrication, Installation and Repair of GRFP fire water line. Bonding of elbow and flange by reinforced lamination, Mechanical coupling of flanged ends of 20′ GRFP line to bellow. Commission and testing of newly installed GRFP fire water lines.
Client: ExxonMobil (EDOP)
Year Completed: 2011
Project: Repair & return of Sundyne Compressor Gear Box
Project Description Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami
Client: Chevron
Year Completed: 2011
Project: Supply of Cameras
Project Description Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras
Client: Delta Afrik Engineering Ltd.
Year Completed: 2011
Project: Repair of Compressor for energy works Technology limited
Job Description Repair of 750 Compressor for energy works Technology limited
Client: Nestoil Group
Year Completed: 2011
Project: Supply of Milton Roy Parts
Project Description Frame agreement for supply of Milton Roy products & spare parts (NG01010147)
Client: Shell
Year Completed: 2011
Project: Supply of Ingersoll Rand Parts
Project Description Frame agreement for supply of Ingersoll Rand spare parts (East and West: NG01010099 & NG01010100)
Client: Shell
Year Completed: 2011
Project: Supply of Ingersoll Rand Compressor Spares
Job Description Supply, Installation, Commissioning/Testing of Ingersoll Rand Compressor Spares
Client: Shell
Year Completed: 2011
Project: Supply of OMB Valves
Job Description Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2)
Client: Exxonmobil
Year Completed: 2011
Project: Fabrication and installation of GRE pipes
Project Description Fabrication and installation of GRE spool pipes (Delta South)
Client: Chevron
Year Completed: 2011
Project: Supply of Ingersoll Rand Valve
Job Description Supply of 19 Element Filter Air, 27 Unloader Valve Ingersoll Rand Valve
Client: Shell
Year Completed: 2011
Project: Supply of Line Pipes
Job Description Supply of Line 4″, 16″ & 24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M – line pipes
Client: Addax Petroleum
Year Completed: 2011
Project: Repair of Ruptured Downstream Line
Job Description Repair of ruptured 3″ x 6″ line Downstream 46PSV 7311-A at AMP2 (OML 99) Amenam
Client: Total
Year Completed: 2011
Project: Supply of Cylinder (FMC)
Job Description Supply of Cylinder, Hydraulic, 125×45-62, Slew, 105bar. Mfg Fmc Technologies, P/N 241100301604023, Drawno 241100390270, Item 408. 6 Cylinder, Hydraulic,140x145c1000,Outboard, Valve, Double, Throttle, Type Aron
Client: Exxonmobil
Year Completed: 2011
Project: Kizombe FPSO GRE pipe network site survey
Project Description Fabrication, Installation and Maintenance of GRE/ GRP Pipes and Fittings for Esso Exploration Kizombe FPSO projects
Client: Esso Angola
Year Completed: 2011
Project: BRT Laoding Arms Repairs
Project Description BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms
Client: ExxonMobil
Year Completed: 2011
Project: Repair OF GRE pipes for Interplant corridor projectOML-99
Project Description Supply, Fabrication & Installation of GRE/Line pipes for interplant corridor project
Client: Chevron
Year Completed: 2011
Project: Supply of OMB Products
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products
Client: ExxonMobil
Year Completed: 2011
Project: Supply of  Electroswitch Materials
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials
Client: ExxonMobil
Year Completed: 2011
Project: Supply of Cummins Materials
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials
Client: ExxonMobil
Year Completed: 2011
Project: Supply of Parker Instrumentation Products.
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products.
Client: ExxonMobil
Year Completed: 2011
Project: GRE Piping/Support on Agbami FPSO
Project Description GRE Piping/Support on Agbami FPSO
Client: Chevron