2010
Year Completed: 2010
Project: Kizombe FPSO GRE pipe network site survey
Job Description Fabrication, Installation and Maintenance of GRE Pipes and Fittings for Esso Exploration Angola Projects
Client: Esso Angola / Worley parsons
Year Completed: 2010
Project: Supply of Valves (Hydrasun)
Job Description Supply of Supply of SOV 3-1/8″ #5000 FPR OSHIE Q, R Supply of SOV 3-1/8″ Rating 5000 SOV Valves. Flanged end, full Bore trough conduit, Slab gate, fitted without actuator type. (Hydrasun)
Client: ExproTech
Year Completed: 2010
Project: Supply of OMB Valves
Job Description Supply of Supply of Valve, Ball, Trunnion-Mounted, 6 In, RTJJ, 1500lb, API-6d, A350/A350m Gr. Lf2 Body, Impact Tested, ASTM A 182/A 182m F51 Duplex Ss Ball And Stem, Fire-Safe Desgn, Full Bore, Nylon Seats, Blowout Proof Stem (FBFB2)
Client: Delta Afrik Engineering Ltd.
Year Completed: 2010
Project: Supply of Line Pipes
Job Description Supply of Seamless Carbon Steel Pipe, Manufactured to ANSI B36.10 M, 24″-ASTM API-5L X60, SCH 60,PSL2, double random  length of 36 to 40 feet and manufactured to ASME B36.10 M. line pipes services
Client: Exxonmobil
Year Completed: 2010
Project: Repair & return of Sundyne Compressor Gear Box
Project Description Dismantling of the Compressor Gear box, inspection of spares to identify the bad and non reusable ones for replacement. General cleaning and servicing of the compressor gear box. – Agbami
Client: Chevron
Year Completed: 2010
Project: Supply of Cameras
Project Description Supply of Non-stabilized PTZ Thermal Image & Long Range Day and Night Colour Cameras
Client: Delta Afrik Engineering Ltd.
Year Completed: 2010
Project: Provision of Multi-phase flowmeter for Well Testing Campaign
Job Description Provision of Multiphase Flowmeter for Well Testing Campaign in Land and Swamp of six wells: ALS2T, OBF3LS, OBF35SS,OBF36T,OBF37SS,OBF37LS
Client: Agip
Year Completed: 2010
Project: Bonding & lamination of GRE piping and hoses
Job Description Bonding & Lamination of 8″ and 12″ GRE piping and flexible hoses on Akpo FPSO
Client: Total
Year Completed: 2010
Project: Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line
Job Description Procurement, Fabrication, Installation and Repair of 12″ GRFP Fire Water Line. Isolation of 12 GRFP 12″ line at N street, cutting out of damaged 12″ line, Fabrication of spool, Reinstatement of two 12″ line by fit lamination,Bolting & Installation of Valves with corresponding bolts and nuts and hydro test/Commissioning of all 12 ” lines
Client: WRPC
Year Completed: 2010
Project: Supply of Elbow (Kurvers)
Job Description Supply of Support Saddle, 14″ saddle 180 L 4″ TC421709, U-Bolt, M16; 14″ Neoprene coated, Adhesive Kit, RP 60B 60Z, Conductive Adhesive Kit U 60060101. (Kurvers)
Client: Exxonmobil
Year Completed: 2010
Project: GRE Piping/Support on Agbami FPSO
Project Description Fabrication, Installation, Repair and Testing of GRE lines for GRE Piping/Support on Agbami FPSO
Client: Chevron – Agbami
Year Completed: 2010
Project: Supply of Ameron Pipes
Job Description Supply of Ameron Pipes, 90 degree FRP elbow (2000m) quick lock size 10, 1 HD flange 10″ & 8″ FRP size 250mm, 8″ & 10″ Gasket 180 RE, 3mm thickness, 16 8″ FRP pipes (200mm) plain end, 10 10″ FRP pipes 250mm plain end, 2 12″ FRP pipes 300mm plain end, 20″ FRP pipes 500mm plain end and Lamination kits 400mm reinforced kits
Client: Chevron
Year Completed: 2010
Project: Repairs and maintenance of GRE waterline
Job Description Repairs and maintenance of GRE waterline
Client: TOTAL ( Akpo)
Year Completed: 2010
Project: GRE Piping Repair
Job Description Fabrication, Installation, Repair and Hydro/ Commissioning of 10″ GRE line on Minox 2
Client: Chevron – Agbami
Year Completed: 2010
Project: Supply of Fittings
Job Description Supply of 16″ Elbow SCH 80 DEG. LR, 16″ 0.0 x 0.844″ W.T 90 DEG,  12″ SCH 80. 45 DEG and 6″ Gasket 900 Oval Ring Fittings  (St Louis)
Client: Chevron
Year Completed: 2010
Project: Supply of Compressor Parts (Dresser)
Job Description Supply of Compressor Parts (Dresser), (22) 4.1/2 X 4.1/2 X 3.1/4 X 3.1/2 ” Compressor Section Valve Complete 30 3w21449t Inlet & Discharge Hp,( 26) 5 In Diameter Piston And Cylinder Assembly,
Client: Shell
Year Completed: 2010
Project: Supply of Valves
Job Description Supply of Valves (Parker)
Client: Shell
Year Completed: 2010
Project: Supply of Line Pipes
Job Description Supply of 70KM 4″ & 6″ Bare and 3 Layer PE Coated Sch 80 & Sch 120 API 5L X 52 Seamless Line Pipes
Client: Agip
Year Completed: 2010
Project: Provision of Proverloop
Job Description Provision, Installation and Commission of 12″ Bi-directional Proverloop for NGL line in EPCL,
Client: Agip
Year Completed: 2010
Project: Provision of Crude Storage and Trucking
Job Description Provision of Crude Storage Tank and Trailers for trucking during DST
Client: Addax Petroleum
Year Completed: 2010
Project: Supply of Gas Turbine Generator Governor
Job Description Supply of Gas Turbine Generator EGS-Esses Governor Service
Client: Total
Year Completed: 2010
Project: Supply of Valves
Job Description Supply of HRA 20″ x 20 ANSI 600 RF/ RF manual operatted Ball Valves (Tyco Valves)
Client: Chevron
Year Completed: 2010
Project: Fabrication, installation of fire waterline (GRE)
Job Description Fabrication, installation and re-routing of 20″ fire waterline (GRE)
Client: WRPC
Year Completed: 2010
Project: Condition Monitoring of Ingasoll Rand Compressor
Job Description Condition Monitoring & Assessment of Ingasoll Rand Compressors in all Mobil facilities
Client: ExxonMobil
Year Completed: 2010
Project: Supply of Line Pipes
Job Description Supply of 20’’-ASTM A 333 Gr 6 Seamless BE SCH 120, Seamless Carbon Steel Pipe, All Pipes Are Of Single Random Length of 18 To 20 Feet and Manufactured To ASTM A 333 Gr 6. M. Service: Hydrocarbon.
Client: ExxonMobil
Year Completed: 2010
Project: Intellysis repairs
Job Description 4 Nos Intellysis repairs
Client: ExxonMobil
Year Completed: 2010
Project: Provision of Multi-phase flowmeter for Well Testing Campaign
Job Description Multiphase Well Testing of three wells: KWL3SS, KWL11SS & KWL11LS and OBF36T,UMR4T, UMR5T, UMR6T & IDU7T in Land and Swamp wells
Client: Agip
Year Completed: 2010
Project: Fabrication and installation of fire waterline (GRE)
Job Description Fabrication and installation and re-routing of 12 inch fire waterline (GRE)
Client: WRPC
Year Completed: 2010
Project: Repairs and maintenance of waterline (GRE)
Job Description Repairs and maintenance of GRE waterline: 1. 8Nos 6″ GRE repair on sea water sand filter A – H,  2. 30″ GRE TEE repair on 42″ sea water overboard line,  3. 3″ & 4″ GRE repair on S4 & P4 Fire Hydrant Lines,  4. Repair of 14″ (14×10 reducer) GRE line on fire pump A
Client: Total
Year Completed: 2010
Project: Supply of Line Pipes
Job Description Supply of 59KM 4″ 3 Layer PE Coated Schedule 80 API 5L X 52 Seamless Line Pipes (8.4mm thickness)
Client: Agip
Year Completed: 2010
Project: Repair of broken chlorination unit discharge spool
Job Description Onshore fabrication and offshore installation of broken CPVC pipes
Client: Total
Year Completed: 2010
Project: Supply of Data Fussion
Project Description Supply of Data Fusion & Art Integration for offshore Security Upgrade Projects.
Client: Delta Afrik Engineering Ltd.
Year Completed: 2010
Project: Provision of Multi-phase flowmeter for Well Testing Campaign in Land and Swamp Wells
Job Description Multiphase Well Testing of eight wells: Obk16SS, 16LS, Obf14LS, 15T, 35SS, 35LS, 37SS & 37LS for Well Testing Campaign in Land and Swamp Wells
Client: NAOC
Year Completed: 2010
Project: Fabrication and installation of GRE pipes
Project Description Fabrication and installation of GRE spool pipes (Delta South)
Client: Chevron (Delta South)
Year Completed: 2010
Project: BRT Laoding Arms Repairs
Project Description BRT Loading Arms Repairs: – Procurement, complete overhaul & maintenance of MPN NGL plant, hydraulic & gas operated loading arms
Client: ExxonMobil
Year Completed: 2010
Project: Operation & Maintenance For 2 years NACJ – Marine Unloading Arm Package
Project Description Operation & Maintenance of Loading Arms: 24-hour Operation, monitoring, repair & maintenance of 4 Loading Arms for loading and offloading of petroleum products at the New Atlas Cove Jetty; Stocking of spares for maintenance.
Client: Julius Berger Nigeria Ltd
Year Completed: 2010
Project: Repair OF GRE pipes for Interplant corridor projectOML-99
Project Description Supply, Fabrication & Installation of GRE/Line pipes for interplant corridor project
Client: Chevron
Year Completed: 2010
Project: Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Project Description Overhaul of Sundyne pumps – General Maintenance of Sundyne pumps
Client: NLNG
Year Completed: 2010
Project: Supply of OMB Products
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Supply of OMB Products
Client: ExxonMobil
Year Completed: 2010
Project: Supply of  Electroswitch Materials
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Electroswitch Materials
Client: ExxonMobil
Year Completed: 2010
Project: Supply of Cummins Materials
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Cummins Materials
Client: ExxonMobil
Year Completed: 2010
Project: Supply of Parker Instrumentation Products.
Project Description Blanket Purchase Agreement/Stock Holding: System Automated Agreement for Parker Instrumentation Products.
Client: ExxonMobil