2008
Year Completed: 2008
Project: Repair of GRE lines
Job Description Fabrication, Installation Repair and Testing/ Commissioning of 14″ GRE lines on Amenam
Client: Total
Year Completed: 2008
Project: Blasting and Painting of Ebughu Platform
Job Description Corrosion Control and Protection of Ebughu platform in OML 123 Field
Client: Addax Petroleum
Year Completed: 2008
Project: Inspection and Overhaul of Sundyne pumps
Job Description Inspection, Trouble shooting and Overhaul of Sundyne LMV 331 & 311 pump
Client: NLNG
Year Completed: 2008
Project: Supply and Installation of Air Compressor
Job Description Supply and Installation of Compare Turbo screw Compressor
Client: Agip
Year Completed: 2008
Project: Supply of pipes for flare out Project
Job Description Supply of 16″ & 24″ diameter pipe conforming to API-5L X60, SCH 60, PSL2 – line pipes for flare out Project
Client: Chevron
Year Completed: 2008
Project: Overhaul/Installation of Sundyne Pump
Job Description Overhaul, Installation, Repairs and Commissioning of LMV 331 Sundyne Pump
Client: NLNG
Year Completed: 2008
Project: Repair work on GRE line
Job Description Fabrication, Installation Repair, Testing of 6″ GRE line on Amenam
Client: Total
Year Completed: 2008
Project: Repair of PVC Biocide Line
Job Description Repair, Replacement and Testing of PVC Biocide Line on Amenam
Client: Total
Year Completed: 2008
Project: Repair of GRE Coolong Water Lines on Amenam
Job Description Fabrication and Repair of GRE AMP2 TGC CUNi cooling water on Amenam
Client: Total
Year Completed: 2008
Project: Repair of GRE Injection Line on Amenam
Job Description Repair of broken 3″ line on 28″ x 28″ x 3″ water injection line on AMP2 MEZZ deck on Amenam
Client: Total
Year Completed: 2008
Project: ODP Seawater Project
Job Description Temporary Repair of ODP Seawater Lift Pump on Amenam
Client: Total
Year Completed: 2008
Project: Repair of GRE Discharge spool on Amenam
Job Description Repair of Leak on GX901A of GRE Discharge Spool on Amenam
Client: Total
Year Completed: 2008
Project: Repair of 6″ GRE line
Job Description Fabrication, Installation Repair and Testing/ Commissioning of 6″ GRE lines on Bonga FPSO
Client: Shell
Year Completed: 2008
Project: Repair of 2″ GRE Seawater lines
Repair and replacement of 2″ GRE Seawater lines at AMP1 Amenam
Client: Total
Year Completed: 2008
Project: GRE Pipe Installation
Job Description Fabrication and Installation of 6″ GRE threaded o-let pipes on Amenam
Client: Total
Year Completed: 2008
Project: Repair of GRE lines
Job Description Fabrication, Repair and Installation of 2″ GRE Pipe lines on Amenam
Client: Total
Year Completed: 2008
Project: GRE Pipe Work on Bonga
Job Description Brownfield Maintenance & Engineering POP – GRE pipe works
Client: Dorman Long Engineering Ltd